Loading...
ST9304-CS 980928 (2) Coppell, Texas 75019 The City With A Beautiful Future 972-462-0022 P.O. BOX 478 COPPELL, TEXAS 75019 September 28, 1998 John Mears, P.E. Dallas County Public Works 411 Elm Street Dallas, Texas 75202 RE: Belt Line Road/Project # 91-829 (between MacArthur Blvd. and Denton Tap Road) City of Coppell~Project ~ ST 93-04~. Dear Mr. Meats: I have received and reviewM portions of the right-of-way documents provided to me at the end of August. One of my concerns with the right-of-way documents that were provided is that documents within both the City of Coppell and the City of Dallas were provided this office. It is my understanding that Dallas County is responsible for secaring right-of-way that is in the City of Dallas. There are also three parcels: 2DE-l, 10-SE and l 1-SE that are partially in Copper and partially in Dallas. If in fact each City will be acquiring their own right-of way easements then those parcels need to be divided into parcels that contain only the area within each city. We may need to discuss this further so that one entity or the other takes the responsibility for acquiring those three parcels, with the other entity paying the prorated cost of the acquisition against the area in the City. From my review of the documents, the only parcels entirely within the City of Coppell are 1ROW, 3 ROW, 3-SE, 4-SE, 5-SE, 9-SE-l, 9-SE-2, 12-SE-l, 12-SE-2, 13-ROW, 13-SE. Again, there are three parcels partially in Coppell and Dallas. I am unsure if Dallas County is or has performed a review of the documents, however, there are numerous errors in the right-of-ways parcels as presented to this office. Those errors or concerns are listed as follows: 1. Sheet L4 of L4 shows a different configuration of Parcel 12 from what the individual right-of- way documents show. 2. Parcel 3-SE, the fourth call shows S 00° 09' 40' E on the legal and S 00° 09' 50' E on the exhibit. 3. Parcel 4-SE, the second call shows a distance of 142.36 feet on the legal and 134.31 feet on the exhibit. The eighth call shows a chord bearing of S 85° 15' 30" W on the legal and S 85" 15' 30" E on the exhibit. 4. Parcel 5-SE, the third call shows a chord bearing of S 79° 34' 25" W on the legal and N 34' 25" E on the exhibit. 5. Parcel 9-SE1, the fifth call shows a central angle of 31° 56' 18" on the legal and 31° 56' 184" on the exhibit. Also, on the exhibit the complete direction for the chord bearing is not shown. It appears as though the curve data needs to be moved further left on the legal description. 6. Parcel 9-SE2, the fourth call shows S 86° 15' 41" E on the legal and on Sheet 2 of the exhibit it shows N 86° 15' 41" E and sheet 3 shows S 86° 15' 41" E. 7. Parcel ll-SE, the fourth call shows S 00° 35' 31" W on the legal and S 00° 35' 31" E on the exhibit. Also, on the legal for this same curve information the chord distance should 129.36. ~ 8. Parcel 12-SE1, the second call shows N 86° 15' 41" E on the legal and S 86° 15' 41" E on the exhibit. The fourth call shows N 86° 15' 42" W on the legal and N 86° 05' 42" W on the exhibit. Also, the last call shows N 00° 35' 31" W on the legal and N 00° 35' 32" W on the exhibit. 9. Parcel 12-SE2, the eight call shows N 03° 44' 18" E on the legal and N 03° 44' 19" E on the exhibit. Please be advised that I did not check the closure or the accuracy of the legal description provided, I merely compared the legal to the exhibit. I also did not review any documents for record in Dallas. If you should have any questions concerning these comments, please feel free to contact me at 304- 3686. Sincerely Kenneth M. P.E. Director of Engineering and Public Works