Loading...
Freeport NIP(8.0)-LR041208 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630-9745 REPORT OF REINFORCING STEEL INSPECTION Client: Duke Realty Services, LP Mr. Brian Straley 5495 Belt Line Rd., Ste 360 Dallas TX 75254 Project: Freeport XI & XtI Coppell, Texas Report No.: 223672 Project No.: 049245 Date of Service: 12/03/2004 Report Date: 12/08/2004 Services: Reinforcing Steel Inspection Report of Inspection On this date, a Rone Engineers, Ltd. representative(s) arrived on site as scheduled to perform a Reinforcing Steel Inspection. The results are attached. Technician Time: 6:00am - 7:00am and 8:15am - 8:45am Page 1 of 3 Technician: Bobby Robinson Report Distribution: (I) Duke Realty Services, LP (l) Extrmaet (I) City of Coppell (1) City of Coppell LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We ~-ssume no responsibilily for variation in quality (composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd. 99TM RoneE llglneers 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 121 North Rayner Fort Worth, Texas 76111 (817) 831-6211 Report of Reinforcing Steel Inspection Client: ~V_o~e~)~c-._, ~cr~;.c~-~ L-P ReportNo.: Project Project: ~r~ ~ ~l~ Date of Service: Page Locations and Items Inspected: Items Inspected: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming Non Conforming Conforming Conforming Placing Drawings ~ Bar Length ~ Column Ties Properly Approved and Shape Tied and Spaced Bar Si~ [~ Proper Bar Placement ~ Stirrup Spacing and Type Bar Grade ~ Properly Tied Bars Clean ~ Dowel Bars in Place ~ Welded Splices Number Bars ~ c Proper Cover Discrepancies / Comments: Inspector's Signature: (~c~ ~a/~ Time: # Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No R°neEn gill l 8908 Ambassador Row Dallas, Texas 75247 (214) 630-9745 121 North Rayner Fort Worth, Texas 76111 (817) 831-6211 Client: Project: Report of Reinforcing Steel Inspection Report No.: Project No.: Date of Service: Page Locations and Items Inspected: Non Items lnspe*t*d: Conforming Non Items Inspected: Conforming Non Items Inspected: Conforming ] Conforming Conforming Conforming Placing Drawings j Bar Length ~ Column Ties Properly Approved and Shape Tied and Spaced Bar Size ~ Proper Bar Placement i~/ Stirrup Spacing and Type l/~ Bar Grade ~ Properly Tied t~/ Lapped Splices b/ Bars Clean J Dowel Bars in Place ~ Welded Splices Form Clean ~ Proper Bar Supports ~ Mechanical Splices Number Bars ~ Proper Cover b/ Discrepancies / Comments: Inspector's Signature: ~A¢i ;~ Time: (o~, ~bO,'~ to q:CJ(~j~'--- Client/Contractor Signature: Client/Contractor Copied with Results: Yes / No