Loading...
Four Seasons 2R-LR041207 REPORT OF DAILY FIELD ACTIVITIES Report Number: 94041388.0024 Service Date: December 1,2004 'lrerracon 8901 Carpenter Fn,vy, Ste #100 Dallas, Texas 75247 (214) 630-1010 Client: Hill & Wilkinson LTD Attn: Charles Hoagland 800 Klein Rd Ste 100 Piano TX 75074 Report Date: December 07, 2004 Project: BCE Specialties 989 West Sandy Lake Road Coppell, TX Project Number: 94041388 Services: Daily field activities. On this date, HBC/Terracon's project manager arrived at the above referenced job site as requested to observe the building pad condition located near the truck dock area of the proposed building. Apparently the excavated wall of the raised truck dock pad had sheared away from the main building area due to a lack of lateral support for the exposed wall surface. Ponding rain water was present along this wall at the time of this observation as well. The sheared pad needs to be reworked and recompacted prior to any construction to ensure a solid building foundation for the slab construction. The ponding water adjacent to the building pad may be contributing to the soft soils within the moisture conditioned zone and needed to be removed. Technician: Robert D. Ray (1) Hill & Wilkinson LTD (1) TMSP Consuding Engineers (1) City of Coppell TX (1) BCE Specialties Reviewed by: (1) City of Coppell TX (1) Hardy McCullah/MLM Architects Inc Robert D. Ray, SE.T,~ Senior Project The testa were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods, This report is exclusively for the us~of the client indicaled above and shall not be reproduced except in full without the written approval of HBC/Terracon. Test results transmitted herein are only applicable 1o the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.