Loading...
SS9402B-LR 960229Ellerbee-Walczak, Inc. CONSTRUCTION MATERIALS TESTING 119 MOISTURE-DENSITY RELATIONSHIP CURVE 118 117 ti_ 116 .~ 114 z ~ 113 112 111 110 109 PROJECT: CLIENT: DATE: 5 6 7 Grapevine IV 8 9 10 11 12 13 14 15 PERCENT MOISTURE Pate Bros. Construction 2/29/96 TEST METIIOD: ASTM D-698 SOIL DESCRIPTION: Brown sand /aJw cc: Pate Bros. Coppell-Gareth Campbell MAXIMUM OPTIMUM DRY DENSITY MOISTURE 116.1 8.6 Ronald A. Ellerbee, C.E.T. 6900 So. Freeway, Suite A-1 Fort Worth, Texas 76134 Laboratory: (817) 293-0111 (817] 293-0257 Fax: (817) 596-0941