Coppell South Sub-CS050106 T H E - G I T Y · 0 F
COPP-Ei L
P.O. Box 9478
255 Parkway Blvd
Coppell, TX 75019
Phone: (972)304-3679
Fax: (972)304-7041
ENGINEERING DEPARTMENT
FAX COVER SHEET
To: Daniel Dewey, P.E. Frmm Keith R. Marvin, P.E.
Frog 214-618-4574 Dat~ 1-06-05
Pbuns: 214-618-4570 Page: 6 (including cover sheet)
g~: Plan Review cc:
[] Urgent []For Review [] Please Comment [] Please Reply [] As Requested
Danlel~
Once the roadway impact fees have been paid, the plat can be processed for filing. As far
as plan reviw, everything that we would Inspect here looks fine. There is some dlscrope.cy
between fencing materials on some of the sheets~ bet that work would be pemtitted
through building Inspections.
When TXU gets ready to build this site~ contact this del~,h,,e~t for permitting aed
inspecttolt of the wa'tea' ,sel'vice and the ~ pay#ag.
Feel free to call me to discuss any additional questions you may have.
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLFMSE CALL (972) 304-3679
"City of Cbppell Engineering Excellence By Destgn"
T H E · C I T Y · 0 F
COPPELL
January 6, 2005
Daniel Dewey, P.E.
Halff Associates, Inc.
3801 Parkwood Blvd. Suite 500
Frisco, TX 75034
RE: Coppell South Substation
Fee Assessment Letter
Dear Mr. Dewey:
Enclosed is a copy of the City of Coppell Development Fee Assessment table, along with a copy of the
Development Fee calculations for the referenced development.
Please make payment for the Impact Fees to the City of Coppell in the amount of $286.20 and forward to
the Engineering Department along with a copy of the Fee Assessment table. This amount is a portion of
the assessed fees that need to be paid prior to filing of the final plat. Please note that the Texas
Legislature, under Senate Bill 243, delayed the collection of Water and Sewer Impact Fees until the
issuance of a Building Permit. Please provide a copy of the Engineer's estimate or contract to our office
so the 2% & 4% construction inspection fee can be verified. The construction inspection fees must be
paid prior to the scheduled pre-construction meeting.
The additional fees for water and sewer taps, water meters, and utility inspection fees need to be paid by
separate check at the new Public Works Service Center, 816 S. Coppell Road. Meters will be ordered
when those fees are paid.
Appropriate payment of the required fees will help insure a successful beginning of this project. We look
forward to working with you on this project. If you have any questions, please contact me.
Sincerely,
Keith R. Marvin, P.E.
Civil Engineer
CC~
Jennifer Armstrong, Finance Director
Mary Beth Spletzer, Administrative Secretary, Building Inspections
Glenn Hollowell, Assistant Director of Public Works
Greg Jones, Chief Building Official
Brad Reid, Director of Parks and Recreation
DEVELOPMENT FEE TABLE
Project: CoppelI South Substation
Date: 1/4/2005
TOTAL AMOUNT DUE
FEES DUE PRIOR TO
COUNCIL
APPROVAL
Water Impact Fee $2,240.00
(100% due at Issuance of Building Permit)
Water Tap Inspection Fee $50.00
(100% due at Issuance of Water Meter)
Water Meter Fee (Domestic) $0.00 '
(100% due at Issuance of Water Meter)
Water Meter Fee (Irrigation/Fireline) $211.72
(100% due at Issuance of Water Meter)
Water Meter Deposit (Domestic) $0.00
(100% due at Issuance of Water Meter)
lrrigation/Fireline Meter Deposit $30.00
(100% due at Issuance of Water Meter)
Wastewater Impact Fee $0.00
(100% due at Issuance of Building Permit)
Wastewater Tap Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Utility Final Inspection Fee $0.00
(100% due at Issuance of Building Permit)
Park Fee $0.00 i $0.00
(100% due prior to Council Approval)
Roadway Impact Fee $286.20 $286.20
(100% due prior to Council Approval)
Street Light Fee lnlbrmation not Available
(100% due prior to Acceptance of Prqject) II
Street Sign Fee Information not Available
(100% due prior to Acceptance of Project) II
Construction Inspection Fee Inl~brmation not Available
(100% due prior to Start of Construction) II
FOTAL $2,817.92
TOTAL AMOUNT DUE PRIOR TO FILING FINAL PLAT $286.20
DEVELOPMENT FEE WORKSHEET
PROJECT: Coppell South Substation
DATE: 1/4/2005
Water Impact Fee:
Domestic Meter(s):
Irrigation Meter(s):
Fireline Meter(s):
0
0
Total #: 8 ESU's @ $280.00 ea.
(Due prior to issuance of building permit)
Water Tap Inspection Fee:
Total #: I Connections @ $50.00 ea.
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Domestic Water Meter Fee:
Total #: 0 Domestic Meter(s) @ $0.00
(Single family due prior to issuance of building permit)
(All other developments due prior to issuance of meter)
Irrigation/Fireline Water Meter Fee:
Total #: 1 Irrigation Meter(s) @ $211.72
Total #: 0 Additional irrigation Meter(s) @ $0.00
Total #: 0 Fireline Meter(s) @ $0.00
(100% due prior to issuance of water meters)
Domestic Water Meter Deposit Fee:
Total #: 0 Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Irrigation/Fire Meter Deposit Fee:
Total #: I Meter(s) @ $30.00 ea.
(100% due prior to issuance of water meters)
Wastewater Impact Fee:
Total Domestic Meters ESU's: 0
(Due prior to issuance of building permit)
@ $280.00 ea.
Wastewater Tap Inspection Fee:
Total #: 0 Connections @ $50.00 ea.
(100% due prior to issuance of building permit)
Utility Final Inspection Fee (All developments):
Total #: 0 Lots @ $50.00 ea.
(100% due prior to issuance of building permit)
0 ESU's
8 ESU's
0 ESU's
0 ESU's
$2,240.00
$50.00
$0.00
$211.72
$0.00
$0.00
$0.00
$30.00
$0.00
$0.00
$0.00
Park Fee (For Residential Developments Only):
Page 1
DEVELOPMENT FEE WORKSHEET
* Preliminary plat approved:
After October 26, 1993
0
0
Single-family @ $0.00 per lot
Multi-family @ $0.00 per unit
(100% paid prior to Council approval of final plat)
$0.00
$0.00
$286.20
Information not Available
Roadway Impact Fee:
(See attached fee calculations)
Street Lighting Fees:
Assessed for lighting in the City's right-of-way.
This fee cannot be assessed until after T.U. Electric submits
the lighting plan for the proposed development.
Once the plans are submitted, $292.60 per light will be assessed.
(100% due prior to final acceptance of development)
Street Sign Fees:
Assessed for signage in the City's right-of-way.
(See attached fee calculations if applicable)
Information not Available
Construction Inspection Fees:
A copy of the development contract must be submitted for assessment.
The contracts should indicate the cost to construct the improvements
that are inspected by the Engineering Department.
(2% of development cost required for private improvements)
(4% of development cost required for public improvements)
Information not Available
Page 2
ROADWAY IMPACT FEE CALCULATIONS
PROJECT:
DATE:
CoppeH South Substation
1/4/2005
ROADWAY IMPACT FEE:
Service Area * 10
2ategory ** Industrial
.and Use ** General Light Industrial
Building Area (sf) 900
Development Units ** 0.90
Vehicle Miles per Development Unit ** 1.06
Fee per Vehicle Mile *** $300
Roadway Impact Fee due (Development Units) x
(Vehicle Miles per Development Unit) x (Fee per Vehicle Mile) $286.20
* (Figure 2 - Roadway Impact Fee Study)
** (Table 3 - Roadway Impact Fee Study)
*** (Schedule 2, Page 3 - Roadway Impact Fee Study)