Loading...
Coppell Ind 2-CS040504Ken Griffin- F~: ~:~d~ePoin! §{~)rm~ ,Drai~a~e~.,~Si~ptions . Page From: To: Date: Subject: Ken, "Jarrell, Albert" <albert.jarrell@hillwood.com> 'Ken Griffin' <kgriffin@ci.coppell.tx.us> 5/4/2004 10:22:11 AM FW: Tradepoint Storm Drainage Assumptions We (Hillwood) do want to move forward with grading work at Tradepoint immediately, so Stephen Crawford/Halff Ft. Worth and I scheduled a 4 pm meeting with you today to discuss the following: 1. Our proposed storm drain starting HGL assumptions 2. Existing storm drainage system done by Graham for Bldg 1 and their assumptions 3. Minimum grades in storm drain (Dallas says 0.3%, we will have 0.2% or 0.25% in places) 4. Detention pond grading and ponding below weir elevation (existing pond has standing water in it) 5. Grading permit package (we are assembling this now, but may not have it finished to bring with us. We'll bring some grading plans at least) 6. Schedule Thanks, and we'll see you at 4 pm. Albert CC: "Stephen Crawford (scrawford@halff.com)" <scrawford@halff.com>