Loading...
St Andrews Est-CS050113January 13,2005 -r H ~: '.--C--~--:r- v i o F COPPELL Terry Holmes The Holmes Builders 2629 Dickerson Carrollton TX 75007 Fax:972-242-2931 RE: St. Andrews Estates Dear Mr. Holmes: This letter is written in response to your request for a progress report on the referenced project. As of this date, the paving section is in place and is in need of clean-up and sealing construction joints. There is an existing power pole that was blocked-out during paving construction. As you are aware, this pole needs to be relocated and the blocked-out section of paving completed. At this time, it is my understanding that the sanitary sewer, water main and storm drain is now in place, with the exception of one discharge headwall at Denton Creek. As per our previous discussion, please complete the final one-fourth inch to foot grading of the parkways and place the erosion control devices in such a manner that erosion does not occur on the project in accordance with guidelines of TCEQ. At the completion of the above items, we need to move forward with the finaling of this project. This will require a scheduled walk thru of paving, drainage, sanitary sewer and water. Please notify me as to when this can be accomplished. If you have additional questions or comments, please feel free to contact me. I will be happy to discuss this further with you.