Loading...
WA0001-CS000417Contract Serviees, Inc. ~antzge Conr~'t $er~ms. In~. 7150,Nme~Geno~R.o~¢~ Phof~ 7 | 3-~) I -0747 F~: 71 ~-991-3939 To: @Fax: From: Date: Re: Pages: Mr. Gary Hendricks, P.E., Shimek, Jacobs, & Finklea 214-361-0204 Roy Saldivar Monday, April 17, 2000 @ 10:00 AM Emer8ency Call List 2, including this Dear Mr. Hendricks; In response your telephone request please find Emergency Call List for the City of Coppell, Repainting of the 1.5 MG Elevated Tank. Superintendent: David Cadriel DAY (281) 850-4914 NIGHT (281) 850-4914 Project Manager: David Gaspard DAY (281) 850.4910 NIGHT (281) 850-4910 Director of Safety and Compliance: Mike Fowler (281) 932-0613 (281) 932-0613 ~0/~0'd 6£6£ ~G6 'SAS '~]N(I'IE 'TdNOI.L~N~':J].NI 8f~:0~ 000<T.--~-~d~ r IIil 2'> I apologize for you not receiving this information sooner. Again, I apolo8ize fore the delay. Please feel free to contact me personally if you have any questions. ReEards [ I This facsimile is intended for the person and/or company listed above. If you erroneously receive this facsimile please destroy your copy and contact ':he transmitting person to advise of the error, Any use or dissemination of information contained in this facsimile by any person other than the inten{ ed recipient is unlawful and can result in legal prosecution. If you cannot read this facsimile or did not receive the correct number of pages please contact "~e transmitting person so that corrections can be made, ] SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204 Phone(214)361-7900 RONALD V. CONV/AY, P.E. JOHN W. BIRKHOFF, P.E. JOE R. CARTEIL P.E, GARY C. HENDKICKS, P.E. PAUL A. CAPLINE, P.E. MATT HICKEY, P.E. ROSS L. JACOBS, P.E. Inc. April 10, 2000 Attention: Mr. Roy Saldivar/General Manager Re: City of Coppell Repainting of the 1.5 Million Gallon Elevated Tank ~2:hange Order Number 1 Dear Mr. Saldivar: The City of Coppell finds your proposal for replacing the wet ladder inside the tank bowl dated April 7, 2000 acceptable. Therefore, we are enclosing five copies of Change Order Number 1 to your contract with the City of Coppell for the Repainting of the 1.5 Million Gallon Elevated Storage Tank. Change Order Number 1 covers the additional work required to replace the wet ladder inside the tank bowl. If the change order is acceptable, please sign and return all five copies to this office. Upon execution by the City of Coppell, we will forward two fully executed originals for your files. In addition, the project inspector has noted several areas in the conical section of the tank that are in need of welding repairs. These repairs may possibly exceed the 10-hours originally established in the contract document for welding. On behalf of the City of Coppell and at the project inspeetor's direction, you are hereby instructed that the quantity for the welding repair by the hour may be exceeded by as much as 10 additional hours. Please keep accurate and detailed records of your welders work on this project and submit those with your next pay request. If you have any questions or need additional information, please do not hesitate to contact this office. Enclosures cc: Mr -Glenn Hollowell ~.Larry Davis Henly-Johnston & Associates