Dear Mr. Hendricks;
In response your telephone request please find Emergency Call List for the City of
Coppell, Repainting of the 1.5 MG Elevated Tank.
Superintendent:
David Cadriel
DAY (281) 850-4914
NIGHT (281) 850-4914
Project Manager:
David Gaspard
DAY (281) 850.4910
NIGHT (281) 850-4910
Director of Safety and Compliance:
Mike Fowler
(281) 932-0613
(281) 932-0613
~0/~0'd 6£6£ ~G6
'SAS '~]N(I'IE 'TdNOI.L~N~':J].NI
8f~:0~ 000<T.--~-~d~
r
IIil 2'>
I apologize for you not receiving this information sooner. Again, I apolo8ize fore
the delay. Please feel free to contact me personally if you have any questions.
ReEards
[ I
This facsimile is intended for the person and/or company listed above. If you
erroneously receive this facsimile please destroy your copy and contact ':he
transmitting person to advise of the error, Any use or dissemination of
information contained in this facsimile by any person other than the inten{ ed
recipient is unlawful and can result in legal prosecution. If you cannot read
this facsimile or did not receive the correct number of pages please contact "~e
transmitting person so that corrections can be made,
]
SHIMEK, JACOBS & FINKLEA, L.L.P.
CONSULTING ENGINEERS
8333 Douglas Avenue, #820 Dallas, Texas 75225-5816 Fax (214) 361-0204
Phone(214)361-7900
RONALD V. CONV/AY, P.E.
JOHN W. BIRKHOFF, P.E.
JOE R. CARTEIL P.E,
GARY C. HENDKICKS, P.E.
PAUL A. CAPLINE, P.E.
MATT HICKEY, P.E.
ROSS L. JACOBS, P.E.
Inc.
April 10, 2000
Attention: Mr. Roy Saldivar/General Manager
Re: City of Coppell
Repainting of the 1.5 Million Gallon Elevated Tank ~2:hange Order Number 1
Dear Mr. Saldivar:
The City of Coppell finds your proposal for replacing the wet ladder inside the tank bowl dated April 7, 2000
acceptable. Therefore, we are enclosing five copies of Change Order Number 1 to your contract with the City
of Coppell for the Repainting of the 1.5 Million Gallon Elevated Storage Tank. Change Order Number 1
covers the additional work required to replace the wet ladder inside the tank bowl. If the change order is
acceptable, please sign and return all five copies to this office. Upon execution by the City of Coppell, we
will forward two fully executed originals for your files.
In addition, the project inspector has noted several areas in the conical section of the tank that are in need of
welding repairs. These repairs may possibly exceed the 10-hours originally established in the contract
document for welding. On behalf of the City of Coppell and at the project inspeetor's direction, you are
hereby instructed that the quantity for the welding repair by the hour may be exceeded by as much as 10
additional hours. Please keep accurate and detailed records of your welders work on this project and submit
those with your next pay request. If you have any questions or need additional information, please do not
hesitate to contact this office.
Enclosures
cc: Mr -Glenn Hollowell
~.Larry Davis
Henly-Johnston & Associates