Freeport NIP(8.0)-LR050115Client:
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6500 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
Services:
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 224519
Project No.: 049245
Date of Service: 12/15/2004
Report Date: 01/14/2005
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
MEASURED
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
STrENgTH: 3000 psi ~ 28 Days
SLUMP (in): 3" - 5"
Alii (%):
TEST METHOD:
4% - 6%
ASTM C-172
ASTM C-31
ASTM C-I43
ASTM C-231
MIX DESIGN I.D.: 7750
PLACEMENT DATE: 12/15/2004
WEATHER CONDITIONS: Clear
TIME SAMPLED: 9:30am BATCHTIME: 8;44am
TEMPERATURE (F) - AIR 34 F CONCRETE: 44 F
TRUC}C NO: 1015 TICKET NO: 761683
AIR CONTENT (%): 4.5 UNITWEIGHT(pcf): NA
OVERALL PLACEMENT LOCATION:
Paving, Building XII north parking lot, west half
SLUMP
(inches)
4.75
~I~-1~41 X SAMPLELOCATION:
AS~I~]39 /J//~REPORT OF TESTS ,,
A~! ~ ~l~crete C°mpr~e Cylinder 6" x 12
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) T'tTE
1 1 12/18/2004 3 6.00 28.26 63500
5' southwest fi.om northeast comer
at north approach
2250 Unbonded Cap
1 2 12/22/2004 7 6.00 28.26 102670 3630 Unbonded Cap
1 3 01/12/2005 28 6.00 28.26 131420 4650 Unbonded Cap
1 4 01/12/2005 28 6.00 28.26 140430 4970 Unbonded Cap
Average 4810
1 5 Hold
LIMATATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similax subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01SS Page I of 5
Client:
ineers
Duke Realty Services, LP
Mr. Brian Slraley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houslon, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Services:
Report No.: 224519
Project No.: 049245
Date of Service: 12/15/2004
Report Date: 01/14/2005
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
3000 psi ~ 28 Days
3" - 5"
4% - 6%
ASTM C-] 72
ASTM C-31
ASTM C-143
AST~ C-23 !
ASTM C- ] 064
ASTM C-]23 ]
ASTM C-39
MIXDESIGN I.D.: 7750
PLACEMENT DATE: 12/15/2004
WEATHER CONDITIONS: Clear
TIME SAMPLED: 10:40am BATCHTIME: 10:20am
TEMPERATURE (F)-AH{ 40 F CONCRETE: 52 F
TRUCK NO: 923 TICKET NO: 761693
AIR CONTENT (%): 5.3 UNITWEIGHT(pcf): NA
OVEILS, LL PLACEMENT LOCATION:
Paving, Building XII north parking lot, west half
SAMPLE LOCATION:
REPORT OF TESTS
60' south, 20' east from northwest
MEASURED
SLUMP
(inches)
5.00
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMPRESSIVE
MARRED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
2 1 12/18/2004 3 6.00 28.26 66990 2370 Unbonded Cap
2 2 12/22/2004 7 6.00 28.26 106760 3780 Unbonded Cap
2 3 01/12/2005 28 6.00 28.26 141540 5010 Unbonded Cap
2 4 01/12/2005 28 6.00 28.26 138690 4900 Unbonded Cap
Average 4960
2 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wrilten approval of Rone Engineers, Ltd.
01SS Page 2 of 5
Report No.: 224519
Project No.: 049245 Client: Duke Realty Services, LP
Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We ~sume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~ll withoul the written approval of Rone Engineers, Ltd.
01SS Page 3 of 5
Client:
i nee rs
Duke Realty Services, LP
Mr. Brian Slyaley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Services:
Report No.: 224519
Project No.: 049245
Date of Service: 12/15/2004
Report Date: 01/14/2005
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples beck to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PL~¥F: 27
SPECIFICATION REQUIREMENTS
3000 psi @ 28 Days
3" - 5"
4% - 6%
ASTM C-172
ASTM C-31
ASTM C- 143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN I.D.: 7750
PLACEMENT DATE: 12/15/2004
WEATHER CONDITIONS: Clear
TIME SAMPLED: 12:20pm BATCHTIME: 12:01pm
TEMPERATURE (F)-AIR 50 F CONCRETE: 55 F
TRUCK NO: 1015 TICKET NO: 761705
AIR CONTENT (%): 5.3 UNITWEIGHT(pc0: NA
OVERALL PLACEMENT LOCATION:
Paving, Building XII north parking lot, west half
SAMPLE LOCATION:
REPORT OF TESTS
90' north, 30' east from southwest
MEASURED
SLUMP
(inches)
6.00
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
3 1 12/18/2004 3 6.00 28.26 64570 2280 Unbonded Cap
3 2 12/22/2004 7 6.00 28.26 103160 3650 Unbonded Cap
3 3 01/12/2005 28 6.00 28.26 130710 4620 Unbonded Cap
3 4 01/12/2005 28 6.00 28.26 132620 4690 Unbonded Cap
Average 4660
3 5 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, ere ) or any other feature of similar subject matter provided by persons or conditions over which we have no conttol. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in f~ll without the written approval of Rone Engineers, Ltd.
01SS Page 4 of 5
Report No.: 224519
Project No.: 049245 Client: Duke Realty Services, LP
Water added at site:
Technician: Nathan Witherell
Report Distribution:
(1) Duke Realty Services, LP
( I ) Ex~anet
(I) City of Coppell
(1) City of Coppell
10 gallons
Started: 6:45am
Finished: 3:30pm
K. Scott Watson, AET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific saraples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wriVten approval of Rone Engineers, Ltd.
01SS Pa~e 5 of 5
Client:
ineers
Duke Realty Services, LP
Mr. Brian Stanley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XI1
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 224520
Project No.: 049245
Date of Service: 12/15/2004
Report Date: 01/14/2005
Services:
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the Iaboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southerrl Star
PLANT: 66
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
3" - 5"
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
ex.pt912
MIX DESIGN I.D.: 9349 MEASURED
SLUMP
PLACEMENT OATE: 12/15/2004 (inches)
WEATHER CONDITIONS: Clear 3.25
TIME SAMPLED: 2:30pm BATCHTIME: l:I0pm
TEMPERATURE (F)- AIR 49 F CONCRETE: 56 F
TRUCg NO: 8859 TICm~T NO: 405554
AIR CONTENT (%): NA UNIT WEIGHT (pcf): NA
OVERALL PLACEMENT LOCATION:
Building X[ leave-outs and southwest dock door walls between gridlines A/18 to A/38 and
3./4.5 to A/7
SAMPLE LOCATION:
REPORT OF TESTS
20' north, 5' west from southeast
comer of leave-outs
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
1 1 12/18/2004 3 6.00 28.26 89560 3170 Unbonded Cap
1 2 12/22/2004 7 6.00 28.26 136080 4810 Unbonded Cap
1 3 01/12/2005 28 6.00 28.26 178560 6310 Unbonded Cap
I 4 01/12/2005 28 6.00 28.26 174120 6160 Unbonded Cap
Average 6240
1 5 Hold
LEVIITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing. We assume no responsibiIity for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01SS Page I of 2
Report No.: 224520 RoneEngJneers
Project No.: 049245 Client: Duke Realty Services, LP l~l
Water added at site: 5 gallons
See Report 0224519 for technician time.
Technician: Nathan Witherell
Report Distribution:
(i) Duke Realty Services, LP
(I) Extranet
(I) City of Coppell
(1) City of Coppell
Started: Finished:
K. Scott Watson, AET
CMT Operations Manager
LLMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no conlrol. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fi~ll without the wrinen approval of Rone Engineers, Ltd.
01SS Page 2 of 2
;ers
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian S~raley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
Report No.: 224708
Project No.: 049245
Date of Service: 12/16/2004
Report Date: 01/14/2005
Services:
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
Am (O/o):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
3"-5"
4% - 6%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
except 9 I 2
MIX DESIGN I.D.: 7752
PLACEMENT DATE: 12/16/2004
WEATHER CONDITIONS: Partly cloudy
TIME SAMPLED: 6:35am BATCHTIME: 6:04am
TEMPERATURE (F)-AIR 39 F CONCRETE: 52 F
TRUCK NO: ! 097 TICKET NO: 761746
AIRCONTENT(%t: 5.5 UNITWEIGHT(pc0: NA
OVERALL PLACEMENT LOCATION:
Paving, Building XI, east parking loL south half
SAMPLE LOCATION:
REPORT OF TESTS
20' north, 15' east from southwest
comer
MEASURED
SLUMP
(inches)
5.0
Concrete Compressive Cylinder 6" x 12"
CYLINDER ,MAXIMUM COMPRESSIVE
M~RKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
1 1 12/23/2004 7 6.00 28.26 104200 3680 Unbonded Cap
1 2 01/13/2005 28 6.00 28.26 137190 4850 Unbonded Cap
1 3 01/13/2005 28 6.00 28.26 145330 5140 Unbonded Cap
Average 5000
1 4 Hold
Water added at site: 10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific smnples provided for testing. We assume no responsibility for variation in quality
(composifion, appearance, performance, etc) or any other feature of similar subject manet provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the wri'aen approval of Rone Engineers, Ltd.
01SS Page 1 of 6
8908 Ambassador Row, Dallas, TX 75247
2696 Grave! Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Client:
Duke Realty Services, LP
Mr. Brian Sa'aley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
Report No.: 224708
Project No.: 049245
Date of Service: 12/16/2004
Report Date: 01/14/2005
Services:
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
3" - 5"
4% - 6%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C- 1064
ASTM C-1231
ASTM C-39
MLX DESIGN I.D.: 7752
PLACEMENT DATE: 12/16/2004
WEATHER CONDITIONS: Partly cloudy
TIME SAMPLED: 9:00am BATCHTIME: 8:20am
TEMPERATURE (F)-AIR 47 F CONCRETE: 60 F
TRUCKNO: 648 TICKETNO: 761756
AIRCONTENT(%): 5.4 UNIT WEIGHT (pcD: NA
OVERALL PLACEMENT LOCATION:
Paving, Building X/, east parking lot, south half
SAMPLE LOCATION:
REPORT OF TESTS
lOft north, 15' west form southeast
MEASURED
SLUMP
(inches)
5.0
Concrete Compressive Cylinder 6" x 12"
CYLINDER 1VLS, XIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
2 1 12/23/2004 7 6.00 28.26 109910 3890 Unbonded Cap
2 2 01/13/2005 28 6.00 28.26 138960 4910 Unbonded Cap
2 3 01/13/2005 28 6.00 28.26 145030 5130 Unbonded Cap
Average 5020
2 4 Hold
Water added a~ si~e:
10 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01SS Page 2 of 6
Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rathway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630~9745
CONCRETE COMPRESSIVE STRENGTH TEST
Project: Freeport XI & XII
Coppell, Texas
Report No.: 224708
Project No.: 049245
Date of Service: 12/16/2004
Report Date: 01/14/2005
Services:
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi @ 28 Days
3" - 5"
4% - 6%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN LO.: 7752
PLACEMENT DATE: 12/16/2004
~'EATHER CONDITIONS: Partly cloudy
TIME SAMPLED: 10:45am BATCHTIME: 10:14am
TEMPERATURE (F) - AIR 55 F CONCRETE: 62 F
TRUCK NO: 1097 TICKET NO: 761768
AIR CONTENT (%): 5,8 UNITWEIGItT(pcfI: NA
OVERALL PLACEMENT LOCATION:
Paving, Building X/, cast parking Io~ south half
SAMPLE LOCATION:
REPORT OF TESTS
220' north, 20' west from southeast
MEASURED
SLUMP
(inches)
5.0
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMPRESSIVE
M.4~RICED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
3 1 12/23/2004 7 6.00 28.26 88780 3140 Unbonded Cap
3 2 01/13/2005 28 6.00 28.26 132650 4690 Unbonded Cap
3 3 01/13/2005 28 6.00 28.26 131420 4650 Unbonded Cap
Average 4670
3 4 Hold
Water added at site:
5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We ~ssume no responsibility for variation in quality
(composition, appearance, performance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd
01SS Page 3 of 6
Client:
ineers
Duke Realty Services, LP
Mr. Brian S~aley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 224708
Project No.: 049245
Date of Service: 12/16/2004
Report Date: 01/14/2005
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Conslmction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
3"~5"
4% - 6%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN 1.D.: 7752
PLACEMENT DATE: 12/16/2004
WEATHER CONDITIONS: Partly cloudy
TIME SAMPLED: 12:20pm RATCHTIME: ll:55am
TEMPERATURE (F) - AIR 60 F CONCRETE: 63 F
TRUCKNO: 648 TICRETNO: 761783
AIRCONTENTI%): 5.3 UNIT WEIGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Paving, Building XI. east parking lot. south half
SAMPLE LOCATION:
REPORT OF TESTS
120' south, 30' e~st from northwest
MEASURED
SLUMP
(inches)
5.0
Concrete Compressive Cylinder 6" x 12"
CYLINDER
I~ARKED DATE AGE DIAMETER AJIEA
SET NO. TESTED (days) (inches) (sq.in.)
4 1 12/23/2004 7 6.00 28.26
4 2 01/13/2005 28 6.00 28.26
4 3 01/13/2005 28 6.00 28.26
4 4 Hold
Water added at site:
10 gallons
MAXIMUM COMPRESSIVE
LOAD STRENGTH FRACTURE
(lbs. force) (psi) TYPE
106340 3760 Unbonded Cap
142730 5050 Unbonded Cap
142080 5020 Unbonded Cap
Average 5040
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in ~11 without the written approval of Rone Engineers, Ltd
01SS Page 4 of 6
Ron
Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 224708
Project No.: 049245
Date of Service: 12/16/2004
Report Date: 01/14/2005
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
3" - 5"
4% - 6%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN I.D.: 7752
PLACEMENT DATE: 12/16/2004
WEATHER CONDITIONS: Clear
TIME SAMPLED: 2:45pm BATCHTIME: 2:25pm
TEMPERATURE (F)-AIR 60 F CONCRETE: 66 F
TRUCK NO: 923 TICKET NO: 761801
AIR CONTENT (%): 5.3 UNIT WEIGHT (pcl): NA
OYERALL PLACEMENT LOCATION:
Paving Building XL east parking lot, south half
SAMPLE LOCATION:
REPORT OF TESTS
20' south, 20' east from northwest
comer
MEASURED
SLUMP
(inches)
4.25
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMI~RESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
5 1 12/23/2004 7 6.00 28.26 117260 4150 Unbonded Cap
5 2 01/13/2005 28 6.00 28.26 156810 5550 Unbonded Cap
5 3 01/13/2005 28 6.00 28.26 156670 5540 Unbonded Cap
Average 5550
5 4 Hold
Water added at site:
8 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibiIity for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject maaer provided by persons or conditions over which we have no control Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01SS Page 5 of 6
Report No.: 224708
Project No.: 049245 Client: Duke Realty Services, LP
See Report #224631 for technician time.
Technician: Nathan Witherell
Report Distribution:
(1) Duke Realty Services, LP
(1) Extranet
(1) City of Coppell
(1) City of Coppell
Started: Finished:
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject mater provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd
01SS Page 6 of 6
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
, rs
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 224631
Project No.: 049245
Date of Service: 12/16/2004
Report Date: 01/14/2005
Services:
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
5000 psi ~ 28 Days
3"-5"
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTMC-1231
ASTM C-39
M1X DESIGN I.D.: 9385
PLACEMENT DATE: 12/16/2004
WEATHER CONDITIONS: Partly cloudy
TIME SAMPLED: 4:10am BATCHTIME: 3:40am
TEMPERATURE (F) - AIR 38 v CONCRETE: 52 V
TRUCKNO: 648 TICKET NO: 761726
AIR CONTENT (%): NA UN1TWEIGHT(pc0: NA
OVEI~,LL PLACEMENT LOCATION:
Paving, machine area pad west side ofBuilthng XI
SAMPLE LOCATION:
REPORT OF TESTS
5' north, i0' east from southwest
coFner
MEASURED
SLUM~
(inches)
3.5
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DL~METER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
1 1 12/23/2004 7 6.00 28.26
1 2 01/13/2005 28 6.00 28.26
1 3 01/13/2005 28 6.00 28.26
1 4 Hold
Water added at site:
10 gallons
162350 5740 Unbonded Cap
211960 7500 Unbonded Cap
212080 7500 Unbonded Cap
Average 7500
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01SS Page 1 of 2
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: {214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 224631
Project No.: 049245
Date of Service: 12/16/2004
Report Date: 01/14/2005
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
5000 psi ~ 28 Days
3" - 5"
NA
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
M~X DESIGN I.D.: 9385
PLACEMENT DATE: 12/16/2004
WEATHER CONDITIONS: Partly cloudy
TIME SAMPLED: 5:15anl BATCH TIME: 4:57am
TEMPERATURE (F) - AIR 40 F CONCRETE: 53 F
TRUCK NO: 648 TIEr, mT NO: 761735
AIR CONTENT (%): NA ~wrr WEIGHT (pcf~: NA
OVERALL PLACEMENT LOCATION:
Paving, machine area pad west side of Building XI
SAMPLE LOCATION:
REPORT OF TESTS
50' south, 30' east from northwest
MEASURED
SLUMP
(inches)
4.5
Concrete Compressive Cylinder 6" x 12"
CYLINDER
MARKED DATE
SET NO. TESTED
AGE DIAMETER
(days) (inches)
1VL~XIMUM COMPRESSIVE
AREA LOAD STRENGTH FRACTURE
(sq.in.) (lbs. force) (psi) TYPE
2 1 12/23/2004
7 6.00
28.26 155780 5510 Unbonded Cap
2 2 01/13/2005
2 3 01/13/2005
28 6.00
28 6.00
28.26 206710 7310 Unbonded Cap
28.26 202580 7160 Unbonded Cap
Average 7240
2 4 Hold
Water added at site:
Technician: Nathan Witherell
Report Distribution:
(l) Duke Realty Services, LP
(1) Ex~ranet
(I) City of Coppell
(1) City of Coppell
10 gallons
Started: 3:30am
Finished: 3:30pm
K. Scott Watson, ACT
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients 1o whom they are addressed and shall not be reproduced except in thll without the written approval of Rone Engineers, Ltd.
01SS Page 2 of 2