Cost sheet for the siren relocation
Suzan~
Here is the cost sheet for the siren move. If you have any questions,
please let me know.
John D. Patterson
Emergency Management Officer
Coppell Fire Department
(972) 304-7057
jl~atterson@ci.copl~ell.tx.us
file :ftC :\temp\GW } 00001.HTM 12/9/2004
Estimated Cost Sheet
Relocation of Siren #6
Pier Install
Qty Description Cost Total
1 24" diameter pier with four #8 rebar and #3 rebar ties @ 18" on $2250 $2250
center 3500 PSI concrete lab and testing, cleanup and spoils
removal. 6' x 6' concrete pad around pier with #3 rebar at 14"
o.c.e.w. 1 W' conduit, ground wire, Four (4) 1" (8 threads per
inch) x 48" Anchor Bolts, 6 Hook, 6 TR HDG. Eight (8) 1" (8
threads per inch) x 48" Hex Nut HDG. Eight (8) Flat Washer
HDG
Purchase of Hardware
Solar Charger kit for Siren
I$3800 I$3800
Siren Relocation
j 1 J Siren move and relocation to new location
J$2500 J $2500
Future Cost
1 Run Electricity from relocated power line/transformer to pole _- $2000 _- $2000
ESTIMATED TOTAL COST OF PROJECT--PHASE I $8550.00
ESTIMATED TOTAL COST OF PROJECT--PHASE II $2000.00
ESTIMATED TOTAL COST OF PROJECT $10550.00