Loading...
ST9902-EM041208Suzan Taylor - Cast sheet for the siren relocation Page 1 of 1 qq-oz ^ From: To: Date: Subject: John Patterson Suzan Taylor 12/8/2004 3:02 PM Cost sheet for the siren relocation Suzan~ Here is the cost sheet for the siren move. If you have any questions, please let me know. John D. Patterson Emergency Management Officer Coppell Fire Department (972) 304-7057 jl~atterson@ci.copl~ell.tx.us file :ftC :\temp\GW } 00001.HTM 12/9/2004 Estimated Cost Sheet Relocation of Siren #6 Pier Install Qty Description Cost Total 1 24" diameter pier with four #8 rebar and #3 rebar ties @ 18" on $2250 $2250 center 3500 PSI concrete lab and testing, cleanup and spoils removal. 6' x 6' concrete pad around pier with #3 rebar at 14" o.c.e.w. 1 W' conduit, ground wire, Four (4) 1" (8 threads per inch) x 48" Anchor Bolts, 6 Hook, 6 TR HDG. Eight (8) 1" (8 threads per inch) x 48" Hex Nut HDG. Eight (8) Flat Washer HDG Purchase of Hardware Solar Charger kit for Siren I$3800 I$3800 Siren Relocation j 1 J Siren move and relocation to new location J$2500 J $2500 Future Cost 1 Run Electricity from relocated power line/transformer to pole _- $2000 _- $2000 ESTIMATED TOTAL COST OF PROJECT--PHASE I $8550.00 ESTIMATED TOTAL COST OF PROJECT--PHASE II $2000.00 ESTIMATED TOTAL COST OF PROJECT $10550.00