Loading...
ST9301-CS050112T H IE C I 'iF Y 0 F COPPELL January 12, 2005 Mr. Richard W. Gee, P.E. Texas CMT, Inc. 10044 Monroe Drive Dallas, Texas 75229 Sandy Lake Road / ST 93-01 Construction Materials Testing Request For Proposal Dear Mr. Gee: The City of Coppell has reviewed the proposal your firm recently submitted for the construction materials testing on the Sandy Lake Road project. After careful consideration of the information provided, this letter is to inform you that your firm was not selected to provide testing services related to the project. Your time and effort in preparing and submitting the qualifications is appreciated. The city has two large roadway projects, two water line projects, and numerous small construction projects that are scheduled to start construction in 2005. The city will take your firm into consideration when selecting construction materials testing services for these projects. Sincerely, ylor inator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: staylorO'!ci.coppcll.tx.us 255 pARKWAy * PO 8(DX 9478 ~, COPP£LL ~ X 75019 *- TEL §72/462 OO22 ~- FAX 972/304 3673 COPPELL January 12, 2005 Mr. Bruce Walton QA/QC Supervisor Team Consultants, Inc. 2970 S. Walton Walker Boulevard, Suite 101 Dallas, Texas 75211 Sandy Lake Road / ST 93-01 Construction Materials Testing Request For Proposal Dear Mr. Walton: The City of Coppell has reviewed the proposal your firm recently submitted for the construction materials testing on the Sandy Lake Road project. After careful consideration of the information provided, this letter is to inform you that your firm was not selected to provide testing services related to the project. Your time and effort in preparing and submitting the qualifications is appreciated. The city has two large roadway projects, two water line projects, and numerous small construction projects that are scheduled to start construction in 2005. The city will take your firm into consideration when selecting construction materials testing services for these projects. Sincerely, aylor rdinator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: sta¥lor(a~ci.coppell.tx.us COP?ELL January 12, 2005 Mr. Rodger Southworth, P.E. Terra-Mar - U.S. Labs 11050 Ables Lane Dallas, Texas 75229 RE: Sandy Lake Road / ST 93-01 Construction Materials Testing Request For Proposal Dear Mr. Southworth: The City of Coppell has reviewed the proposal your firm recently submitted for the construction materials testing on the Sandy Lake Road project. After careful consideration of the information provided, this letter is to inform you that your firm was not selected to provide testing services related to the project. Your time and effort in preparing and submitting the qualifications is appreciated. The city has two large roadway projects, two water line projects, and numerous small construction projects that are scheduled to start construction in 2005. The city will take your firm into consideration when selecting construction materials testing services for these projects. Sincerely, ylor inator Engineering Department Direct: 972-304-7019 Fax: 972-304-3570 E-mail: sta¥1orC/ici.coppell.tx.us