Loading...
RC Townhomes-CS050120 T H E C I T Y . 0 F coPP-EE£ January 20, 2005 Jason R. Rose Coppell Townhouses, LLC 410 Spinnaker Drive Allen TX 75013 RE: Riverchase Townhomes Addition Dear Mr. Rose: We are in receipt of your letter of January 12, 2005 requesting approval to perform paving for your development by using a combination of hand placement as well as use of a vibratory screed in lieu of a paving machine. We have reviewed your letter and proposal and have determined that the use of a paving machine will be required for those portions where machine placement is possible. Hand placement will be permitted only where the machine cannot be used. We made this determination based on our need for long-term durability of the concrete to be placed, and feel the vibratory screed and hand placement does not permit the required consolidation of paving materials. As you are aware, developers are required to provide a 2-year maintenance bond for public portions of a development's paving. The City takes over maintenance for the duration of the life of the street at the end of the two years. Due to those concerns, we feel the best quality and long term durability rests in following the existing standards and requirements. In reference to your additional request for leave-outs of the drive approaches, a leave-out will only be considered for any driveway that will be constructed within 90 days after the final acceptance of the infrastructure by the inspector, Larry Davis. The details of the leave-out will need to be worked out to the satisfaction of Mr. Davis. If you have any other questions or would like to discuss these matters, please feel free to call me. Sincere~.,~, Keith R. Marvin, P.E. Civil Engineer Office: (972) 304-7044 Fax: (972) 304-3570 cc: Larry Davis, Construction Inspector