Freeport NIP(8.0)-LR050119Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 225787
Project No.: 049245
Date of Service: 01/11/2005
Report Date: 01/19/2005
Services:
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
cOWrRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PL.~r: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
3" - 6"
4% - 6%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-I064
ASTM C-1231
ASTM C-39
MIX DESIGN I.D.: 7752 MEASURED
SLUMP
PLACEMENT DATE: 01/11/2005 (inches)
WEATHER CONDITIONS: Cloudy 4.75
TIME SAMPLED: 7:36am BATCH TIME: 7:02am
TEMPERATURE (F)- AIR 66 F CONCRETE: 64 F
TEvcK No: 1815 TIC~TNO: 763510
AIR CONTENT (%): 5.4 tr~rr WEIGHT (pcO: NA
OVERALL PLACEMENT LOCATION:
Paving, drive between Buildings l I and 12 at 40' noffil to 50' south, 0' to 60' west of the
southwest comer of Building 11; 0' to 40' south, 0' to 100' east of the southwest comer of
Building 11
SAMPLE LOCATION: 20' north, 35' west of southwest
REPORT OF TESTS co~¢r of Building 12
Concrete Compressive Cylinder 6" x 12"
CYLINDER
MARKED DATE
SET NO. TESTED
I 1 01/18/2005
MAXIMUM COMPRESSIVE
AGE DIAMETER AREA LOAD STRENGTH FRACTURE
(days) (inches) (sq.in.) (lbs. force) (psi) TYPE
7 6.00 28.26 113190 4000 Unbonded Cap
1 2 02/08/2005
1 3 02/08/2005
28 0.00 0.00 Unbonded Cap
28 0.00 0.00 Unbondcd Cap
1 4 Hold
Water added at site: 5 gallons
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01SS Page I of 2
Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, See. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 225787
Project No.: 049245
Date of Service: 01/11/2005
Report Date: 01/19/2005
Services:
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strengn, h samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: SouthelTl Star
I'LANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
4% - 6%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C- 1231
ASTM C-39
MIX DESIGN I.D.: 7752 MEASURED
SLUM1~
PIMtCEMENT DATE: 01/11/2005 (inches)
WEATHER CONDITIONS: Cloudy 4.25
TIME SAMPLED: 10:01am BATCHTIME: 8:45am
TEMPERATURE (F} - AIR 68 F CONCRETE: 80 F
TEUCKNO: 1840 TICKET gO: 7632522
AIR CONTENT (%): 5.2 UNIT WEIGHT (per): NA
OVERALL PLACEMENT LOCATION:
Paving, drive between Buildings 11 and 12 at 40' north to 50' south, 0' to 6ff west of the
southwest comer of Building 11; 0' to 40' south, 0' to 100' east of the southwest comer of
Building 11
SAMPLE LOCATION:
REPORT OF TESTS
Concrete Compressive Cylinder 6" x 12"
30' south, 65' east of southwest
comer of Building 11
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
2 1 01/18/2005 7 6.00 28.26 112010
2 2 02/08/2005 28 0.00 0.00
2 3 02/08/2005 28 0.00 0.00
2 4 Hold
Water added at site: 5 gallons
Technician: Ben Weaverling
Report Distribution:
(1) Duke Real~y S~rvices, LP
(1) Ex~ranet
(1) City of Coppell
(1) City of Coppell
Started: 7:00am
Finished: 1 l:00am
3960 Unbonded Cap
Unbonded Cap
Unbonded Cap
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject maner provided by persons or conditions over which we have no control. Our lettors and
reports are for the exclusive use of the clienls to whom they are addressed and shall not be reproduced except in fi~ll without the written approval of Rone Engineers, Ltd.
)ISS Page 2 of 2
Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: 1214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Project: Freeport XI & XII
Coppell, Texas
Report No.: 224993
Project No.: 049245
Date of Service: 12/21/2004
Report Date: 01/19/2005
Obtain samples of fi-esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
STRENGm: 4000 psi ~ 28 Days
SLUMP (in): 3" - 5"
AIR (%): 3% - 5%
TEST METHOD: ASTM C- 172
ASTM C-31 ~x**~
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN I.D.: 7752
PLACEMENT DATE: 12/21/2004
WEATHER CONDITIONS: Clear/Cold
TIME SAM_PLED: 5:00am BATCH TIME: 4:20am
TEMPERATURE (F) - AIR 51 F CONCRETE: 60 F
TRUCK NO: 1883 TICKET NO: 761930
AIRCONTENT(%): 4.2 UNITWEIGHT(pe0: NA
OVERALL PLACEMENT LOCATION:
Paving at north side ofXl 1 and south side XI
SAMPLE LOCATION:
REPORT OF TESTS
30' west, 4' north of the
southeast corner
MEASURED
SLUMP
(inches)
5.5
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
1 1 12/28/2004 7 6.00 28.26 118880 4200 Unbonded Cap
1 2 01/18/2005 /e28 6.00 28.26 155050 /~480 Unbonded Cap
1 3 01/18/2005 L28 6.00 28.26 158430 { 5600 Unbonded Cap
Average "--r~40
i 4 Hold
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our leRers and
reports are for the exclusive use of the clients to whom they are addressed and shalI not be reproduced except in bail without the wriaen approval of Rone Engineers, Ltd.
01TM Page I of 4
one
ineers
Client:
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 224993
Project No.: 049245
Date of Service: 12/21/2004
Report Date: 01/19/2005
Services:
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive slrength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCREIE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
Y' ~ 5"
3% - 5%
ASTM C-172
ASTM C-3I ~p, 9~:
ASTM C-143
ASTM C-23 !
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN I.D.: 7752
PLACEMENT DATE: 12/21/2004
WEATHER CONDITIONS: Clear/Cold
TIME SAMPLED: 6:30am BATCHTIME: 5:35am
TEMPERATURE (F)-AIR 51 F CONCRETE: 60 F
TRUCK NO: 1020 TICr.~T NO: 761941
AIRCONTENT(%): 3.9 UNIT WEIGHT (pc0: NA
OVERALL PLACEMENT LOCATION:
Paving at north side of X11 and south side XI
SAMPLE LOCATION:
REPORT OF TESTS
200' west, 20' north of the
southeast comer
MEASURED
SLUMP
(inches)
4.5
Concrete Compressive Cylinder 6" x 12"
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (~bs. force) (psi) TYPE
2 I 12/28/2004 7 6.00 28.26 114250 4040 Unbonded Cap
2 2 01/18/2005 28 6.00 28.26 155210 ~490 y Unbonded Cap
2 3 01/18/2005 28 6.00 28.26 148240 ~ Unbonded Cap
Average 5370
2 4 Hold
Water added at site: 5 gallons
LIM-ITATIONS: The test results presented herein were prepared b~sed upon the specific samples provided for testthg. We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in fitll without the written approval of Rone Engineers. Ltd.
01TM Page 2 of 4
Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: :>.24993
Project No.: 049245
Date of Service: [2/21/2004
Report Date: 01/19/2005
Obtain samples of fi-esh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
3"-5"
3% - 5%
ASIM C-172
ASTM C-31
ASTM C-I43
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN I.D.: 7752
PLACEMENT DATE: 12/21/2004
WEATHER CONDITIONS: Clear/Cold
TIME SAMPLED: 8:00alTl BATCHTIME: 6:53am
TEMPERATURE (F)-AIR 52 F CONCRETE: 61 F
TRUCK NO: 1020 TlCK~T NO: 761949
AIR CONTENT (%): 4.0 UNITWE1GHT(pcf): NA
OVERALL PLACEMENT LOCATION:
Paving at north side ofXl 1 and south side XI
SAMPLE LOCATION:
REPORT OF TESTS
75' west, 37' north of the
southeast comer
MEASURED
SLUMP
(inches)
4.25
Concrete Compressive CyIinder 6" x I2"
CYLINDER MAXIMUM COMPRESSIVE
MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE
SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE
3 1 12/28/2004 7 6.00 28.26
3 2 01/18/2005 28 6.00 28.26
3 3 0I/18/2005 28 6.00 28.26
3 4 Hold
111450 3940 Unbonded Cap
133640 4730 Unbonded Cap
142590 5040 Unbonded Cap
Average 4890
LhMITATJONS: The test resulls presented herein were prepared based upon the specific samples provided for testing We ~ssume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and
reports are for the exclusive use of the clients to whom they me addressed and shall not be reproduced except in full without the vaStten approv*d of Rone Engineers, Ltd
01 TM Page 3 of 4
Ron
Client:
ineers
Duke Realty Services, LP
Mr. Brian Straley
5495 Belt Line Rd., Ste 360
Dallas TX 75254
Project: Freeport XI & XII
Coppell, Texas
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6500 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 650-9745
CONCRETE COMPRESSIVE STRENGTH TEST
Report No.: 224993
Project No.: 049245
Date of Service: 12/21/2004
Report Date: 01/19/2005
Services:
Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring
samples back to the laboratory for curing and testing in accordance with applicable standards.
PROJECT DATA
STRENGTH:
SLUMP (in):
AIR (%):
TEST METHOD:
CONTRACTOR: Duke Construction
CONCRETE SUPPLIER: Southern Star
PLANT: 27
SPECIFICATION REQUIREMENTS
4000 psi ~ 28 Days
3"- 5"
3%-5%
ASTM C-172
ASTM C-31
ASTM C-143
ASTM C-231
ASTM C-1064
ASTM C-1231
ASTM C-39
MIX DESIGN I.D.: 7752
PLACEMENT DATE: 12/2 1/2004
WEATHER CONDITIONS: Clear/Cold
T1MESAMPLED: 9:15am BATCHTIME: 8:26am
TEMPERATURE (E} - AIR 54 F CONCRETE: 62 g
TRUCK NO: 931 TICKET NO: 761959
AIR CONTENT (%): 4.1 UNIT WEIGHT (pcI): NA
OVERALL PLACEMENT LOCATION:
Paving at north side of Xll and south side X1
SAMPLE LOCATION:
REPORT OF TESTS
IT west, 32' north of the
MEASURED
SLUMP
(inches)
5.0
Concrete Compressive Cylinder 6" x 12"
CYLINDER
MARKED DATE AGE
SET NO. TESTED (days)
DIAMETER AREA
(inches) (sq.in.)
MAXIMUM COMPRESSIVE
LOAD STRENGTH FRACTURE
(lb~ force) (psi) TYPE
4 1 12/28/2004
4 2 01/18/2005
4 3 01/18/2005
4 4 Hold
Technician: Scott Mitchell
Report Distribution:
(1) Duke Realty Services, LP
(1) Extranet
(I) City of Coppell
(l) City of Coppell
7 6.00
28 6.00
28 6.00
Started: 3:]Sam
28.26 108210
28.26 131600
28.26 135530
Average
Finished: l:lSpm
3830 Unbonded Cap
4650 Unbonded Cap
4790 Unbonded Cap
4720
K. Scott Watson, AET
CMT Operations Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, performance, etc) or any other feature of similar subject matter provided by persons or conditions over which we have no control Our letters and
reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineers, Ltd.
01TM Page 4 of 4