Loading...
ST9302-CS031110Walk Through Sandy Lake Road Project ST 93-02 November 10, 2003 The eastern driveway at Minyards needs to be adjusted by 1 1/2, by raising the front section and lowering the back section. V2. At Heatherglen need to lower the front side of the crosswalk by approximately 3". Send letter back to Accessology, Inc. stating that a 30 x 48 area provided for PED button and that cross button is within reaching distance. (that comment should be eliminated). 4. Southwest intersection of Sandy Lake/Heartz, while not on the list, it does need to have a crosswalk created to the ramp with contrasting colors, particularly the north/south direction. Southwest intersection before Sandy Lake/Heartz need to raise the sidewalk headed v/~est up to the level spot of the curb ramp. Rebuild the curb ramp possibly band it in concrete with dark gray pavers to create contrast. This will create the level floor space for the PED Buttons. '/~0~9~, 3'q. way at Sandy Lake the grooved areas of the crosswalk need to be stained. ~/~Simmons west, the west intersection need to remove curb ramp, and rebuilt it. Lowering it to create a flat landing area for the ramp and then stain accordingly. The cross slope between the curb ramps needs to be removed and replaced. X/Simmons west, the east side of west Simmons bring the color of the ramp straight up (don't color the whole section of the ramp). ~Simmons east, need to remove the whole intersection back to where we previously changed the grade to direct more water to Sandy Lake to create a flat area. ~/Dobecka need to paint the north half of both ramps (not entire ramp) x/6. Castlebury southeast corner, nothing to be done other than painting the ramp in its entirety. Paint ramp up to the southeast comer, paint ramp beyond the actual ramp itself to the level spot about 2 1/2 feet beyond the center of the ramp. '/Sandy Knoll and Sandy Lake need to paint the ramps. X~ighland Meadow/Sandy Lake southwest corner, need to rebuilt the top of the ramp to a differefflie color. Page I ~Iighland Meadow/Sandy Lake southeast comer, need to create a level area, potentially bring the sidewalk around, then build ramps off of sidewalk. /Holly south/Sandy Lake need to paint the ramps straight line up both sides to align with the sidewalk. v/Nash/Sandy Lake southwest comer, need to paint, southeast comer need to remove ramp create flatter sloping ramp and flat section of sidewalk and then paint. '~9. Moore/Sandy Lake southwest comer, need to create the clear space by building the curb and raising the sidewalk. Need to build a sidewalk all the way around connect the ramps and then put in 2 curb ramps 3 foot wide matching up with the crosswalks. Include the clear floor space as a repair don't include as a variance. 48" should be running the north/south, which gives a longer reach distance. 10. Sandy Lake/Moore southeast comer, need to adjust the sidewalk and create a level landing at the PED Button, 48" running east/west. Raise the crosswalk, crossing and x~/ the ramps at the western most driveway into the shopping center on south side of Moore Rd and Sandy Lake both ramps need to be removed and replaced cross slope of the driveway needs to be flattened. Middle driveway at the shopping center needs to be painted along with the eastern most driveway. Sidewalk on the east side of the alley east of the shopping center at Moore/Sandy Lake needs to be painted / look at grooving for texture differences. ~?& paint the crosshatched area of the crosswalk. Request variance for crossing, if not approved, then need to remove and replace. Sandy Lake/Samuel southwest comer, need to remove the existing ramp make it flat with the street, create a ramp coming up on the west side of it to a landing ramp and a ramp from that landing area to the sidewalk, then remove the concrete on the east side of the ramp, create a flat landing area at the PED Button, and then create a steeper piece of concrete to connect the two, that would be a pedestrian, but not ADA accessible area. (no variance on this one, needs to be fixed) Sandy Lake/Samuel southeast comer, the clear floor space issue #17 goes away. If we rebuild the ramp on the southeast comer probably need to put in a series of ramps and tums to get the appropriate slopes. ,~andy Lake/Mockingbird southwest comer, need to paint the grooved area of the ramp. ~Sandy Lake/Mockingbird southeast comer, need to remove and replace the ramp to get the right slope on it. Page 2 Sandy Lake/Mapleleaf the crossing between the ramps need to remove and replace to get a 3 foot flat area or 2% slope area. Potentially try to rework the pavers to get to a 3 foot area that is flat or is 2% cross slope. Color of the ramps 3~foot wide leading into the sidewalks Sugarberry/Sandy Lake need to color the ramps both sides. MacArthur/Sandy Lake southwest comer, need to pour a concrete pad area by the PED Buttons. MacArthur/Sandy Lake southeast comer, need to pour a concrete pad area by the PED button. Clear space area, need to remove the concrete area around the pole at the northeast comer and create a clear landing area. Kroger, the eastern most driveway I am not sure how to approach, hopefully will get a variance if not we need to take out all the walls, sidewalks, ramps, entrances, ~/driveways, about another 25-30 feet of the Kroger parking lot and lower everything down to make it work. Kroger, the east side of the main driveway need to paint a 3-foot area across the ~/crosswalk to the level portion of the sidewalk approximately 6-7 feet away. The western most driveway at Kroger leave the existing ramps and pavers alone but need to cut in two additional ramps closer to the street and the flat area and paint accordingly. Potentially look at the eastern most driveway to cut in two additional ramps. v/~ountainview/Sandy Lake need to stain the ramps on both sides and paint all the way to second joint outside the grooved area of both sides up to the flat area. 28. Need to paint the portion of the sidewalk that slopes too much as a curb ramp. Note that in the letter to Accessology, Inc. on both sides of Meadowglen. 29. On the cross slope of the ramps either cross walk between the ramps either pull out ramps, rebuild, potentially cut in two additional ramps closer to Sandy Lake Rd. ~Meadowmn/Sandy Lake need to paint the ramps beyond up to the sidewalks where they are flat. ~teeOrgetown Plaza eastern most driveway request a separate variance for this due to chnical issues associated with trying to connect to existing driveways, exiting utilities, and cross slope of Sandy Lake Rd. -/Georgetown Plaza middle driveway need to stain a 3-foot wide area across the ramp not the entire ramp on sides of the middle driveway. On the ramps on the both sides Page 3 of the middle driveway sawcut out the grooves further into the flat landing area. Remove eastern ramp at the western most driveway to Georgetown Plaza, put in a 3- foot ramp connected to a sidewalk. The westernmost driveway to George Town [~/'Plaza need to rebuild the sidewalk to come up to the brick pavers. Build an additional ramp off of the east side of it and on the west side. Probably need to rework the brick pavers to get a 2% cross slope. 32. Samuel/Sandy Lake northeast corer ????meets requirements x//(Nnot an issue) Still need to create contrasting color at the top of the ramps. eed to pour a pad area around the traffic light pole at the northwest corner of Sandy Lake/Samuel. On the east side of the traffic signal run the 48 on the north south and 30 on the east west. Also, on the northwest corner need to create contrasting color at the top of the ramp. ~PS Building, the eastern driveway needs to have paint up on the sidewalk 3-foot wide. L/~PS Building western driveway need to cut two new ramps further south to align with the flat area of the crossing, need to stain the new ramps. Sandy Lake/Moore northeast corner, need to build a 30 x 48 pad on the east side of x~the traffic signal for the PED button, 48 running north/south. Need to provide contrasting color at the top of the ramps 36. Sandy Lake/Moore northwest corner need to build a pad on the north side of the traffic signal 48 running east/west, on the north side of Moore potentially both sides x/ of the intersection maybe can pour 3-foot wide sidewalk behind the existing paver bands to take care of the contrasting color issue. Aandy Lake Baptist Church need to stain the ramp on the west side of the driveway to the. Need to groove the sidewalk section to provide a texture difference. ~/tRejoice Lutheran Church driveway need to put on blanket variance request. If have o fix need to lower the crossing and stain both sides of the driveway approach as a ramp. L//SAandy Lake/Holly north part of the blanket variance request. In letter to ccessology, Inc. appears to be within construction tolerance and to remove from list. Need to stain both sides of the ramp and provide some texture differential. ~. Sandy Lake/Lodge 4 ramps on the north side, request a variance. If not, have to take out and rebuild the ramps to provide 4 ramps and a flat area with contrasting color. x/nTrailwood ramp northeast side, need to stain the textured area of the ramp. On the orthwest side of Trailwood/Sandy Lake don't color the textured area of the ramp but color the first panel of the sidewalk on either side of the ramp. Page 4 Sandy Lake/Allencrest ramp need to stain the crosshatched portion. Sandy Lake/Woodcrest need to stain the crosshatched portion of the ramps. V~39. Sandy Lake/Heartz northeast corner, the clear floor space pad issue will go away, it is in compliance. Still need to provide color differential at the top of the ramp. X/~0. Sandy Lake/Heartz northwest corner, need to provide the pad for a clear flood space probably on the east side of the traffic signal. Also need to provide color differentiation at the top of the ramp. Tom Thumb 2 driveway ramps: The eastern most section of the eastern driveway ~//need to stain the second sidewalk panel away from the cross hatched (do not need to stain the crosshatched area). On the west side of the eastern most driveway need to stain the south side of the cross hatched area or a 3-foot section through there. At the western most driveway, need to stain the ramp and the first sidewalk panel on the east side of the driveway and on the west side need to stain the ramp. Page 5