;oncrete Cylinder Test Report
FAIRWAYS OF RIVERCHASE
D3-456A-01-24675
rD
RIVERCHASE ESTATES LTD.
OCT. 7, 1993
OCT. 15. 1993
STA: 1+91 PINERTTRST DRIVE
SITE CONCR~:'rE, INC. Truck ~cket
SupCer ptan~ 2 6
SITE CONCRETE
;¢ 4 ;,mb+em Temperature ¢F) Concr~e Temperature (°F)
WeaM3er Conditions 69 ~ 72
OVERCAST
~me s~o~ 0 0 GALS
9: 45 ~ Wa~r adO~ ·
iPhysica[ Data
ACTUAL SPECIFICA~ONS
SLUM~ (in.) 6
AIR ENTRAINMENT (%) 5.8
;oncrete Cylinder Test(s)
SPECIFICATIONS
ACTUAL
Sf:~c~rnen Age Te~'t Date
No. (Days) (lbs.) (PsO
115 7 10/14/93 91000 3220
116 28 11/04/93
t17 28 11/04/93
118 HOLD HOLD
SM-engM~ Required
4000
Cudng Method lASTM C 3~ IAr~ 28.27 sQ. in. Engineer/Tecnnic~a~
ROGER CRABTREE (RONE)
t~,~'ks and/or Dismbution
NATHAN D. MAIER/MIKE GARRETT (1) , CITY OF COPPELL/LAP. RY DAVIS (1)
Rone Engineers Rone !Fleers
Geoteohnical Consultants
Ma[edals Testing
;oncrete Cylinder Test Report
Proieot Purcf~.se OrOer
FAIRWAYS OF RIv~'.t4CHASE
I r~. 7, 1993 OCT 15, 1993
D3-456A-01-24675-A
RIVERCHASE ESTATES LTD.
Loc:a~on
ALLEY B APPROACH AT PINEHURST
SITE CONCRETE, INC. ir=ke~
Suprer P~an~ T~ck
SITE CONCRETE , 50
OVERCAST
Aml~ent Tempera~re CF}
85
Conorete Temperature
76
~me Sampled Water Added
1:30 PM 0.0 GALS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5
AIR ENTRAINMENT (%) 3.5
Concrete Cylinder Test(s)
SPECIFICATIONS
ACTUAL
(Days) T~ ~m Obs.) ~0
119 7 10/14/93 92000 3250
120 28 11/04/93
121 28 11/04/93
122 HOLD HOLD
:,efmml<s and/or Di~lbut~n
NATH~XN D.
S~ngCtR~uir~
4000
I ROGER CRABTREE (RONE)
MAIER/MIKE GARRETT (1), CITY OF COPPELL/LARRY DAVIS (1)
none Engineers
Geotechnical Consultants
Materials Testing
Concrete Cylinder Test Report
Pro~-t Purci3ase Orcler
FAIRWAYS OF RIVERCHASE
D3-456A-01-24675-B ~ OCT. 7: 199q 1~ 1993
RIVERCHASE ESTATES LTD.
STA: 2+40 PINEHURST DRIVE
SITE CONCRETE, INC.
!Supplier I Plax-ct Truck T~cket57
SITE CONCRETE I
0. 0 GALS
4:10 PM WaterAdOed
iPhysical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 5
AIR ENTRAINMENT (%) 3.0
Concrete Cylinder Test(s)
ACTUAL SPECIFICATIONS
AgeI j Tot Load Coml3ressNe 513'engl~ Sb'sng¢l Required
(Days) Test Date (]Ds.) P0 83s~
87500 3100 4000
!SPe~men
123 7 10/14/93
124 28 11/04/93
t25 28 11/04/93
126 HOLD HOLD
Cunng
IASTM C 39 I~ea 28=7 sq. i~
ROGER C~BTREE (RONE)
~ C 31
3~=ma~ks and/or D~s~butJan
NATHAN D. MAZER/MIKE GARRETT (1) , CITY OF COPPELL/LARRY DAVIS (1)
Rone Engineers R o n e E n ¢
Geotechnical Consu~tan[s
Ma[erials Testing
Concrete Cylinder Test Report
:~roiect Purcflase Order
FAIRWAYS OF RIVERCHASE
D3-456A-01-24675-C I OCT. 7. 1993 OCT. 15. 1993
rD
RIVERCHASE ESTATES LTD.
2ND TOP FROM SOUTH END OF JOB ON THE WEST SIDE
SITE CONCRETE, INC.
Supp6er Ip~-~tl Truck T}cket
REDI-MIX I 44884
4715
CLOUDY 76 75
4:20 PMI 0.0 GALS
Physical Data
ACTUAL SPECIFICA-~ONS
SLUMP (in.) 2 1/2
Concrete Cylinder Test(s)
SPECIFICATIONS
NO. (Days)
Test Date
ACTUAL
Obs.)
127 7 10/14/93
128 28 11/04/93
129 28 11/04/93
130 HOLD HOLD
152500 5390
Streng~ Required
(ps,]
3000
IASTM C 39 IArea 28.27 sq. in.
I ROGER CRABTREE (RONE)