Loading...
Riverchase(3)-LR 931015Rone Engineers Geotechnical Consuttants Materials Testing RoneEn ReeFS ;oncrete Cylinder Test Report FAIRWAYS OF RIVERCHASE D3-456A-01-24675 rD RIVERCHASE ESTATES LTD. OCT. 7, 1993 OCT. 15. 1993 STA: 1+91 PINERTTRST DRIVE SITE CONCR~:'rE, INC. Truck ~cket SupCer ptan~ 2 6 SITE CONCRETE ;¢ 4 ;,mb+em Temperature ¢F) Concr~e Temperature (°F) WeaM3er Conditions 69 ~ 72 OVERCAST ~me s~o~ 0 0 GALS 9: 45 ~ Wa~r adO~ · iPhysica[ Data ACTUAL SPECIFICA~ONS SLUM~ (in.) 6 AIR ENTRAINMENT (%) 5.8 ;oncrete Cylinder Test(s) SPECIFICATIONS ACTUAL Sf:~c~rnen Age Te~'t Date No. (Days) (lbs.) (PsO 115 7 10/14/93 91000 3220 116 28 11/04/93 t17 28 11/04/93 118 HOLD HOLD SM-engM~ Required 4000 Cudng Method lASTM C 3~ IAr~ 28.27 sQ. in. Engineer/Tecnnic~a~ ROGER CRABTREE (RONE) t~,~'ks and/or Dismbution NATHAN D. MAIER/MIKE GARRETT (1) , CITY OF COPPELL/LAP. RY DAVIS (1) Rone Engineers Rone !Fleers Geoteohnical Consultants Ma[edals Testing ;oncrete Cylinder Test Report Proieot Purcf~.se OrOer FAIRWAYS OF RIv~'.t4CHASE I r~. 7, 1993 OCT 15, 1993 D3-456A-01-24675-A RIVERCHASE ESTATES LTD. Loc:a~on ALLEY B APPROACH AT PINEHURST SITE CONCRETE, INC. ir=ke~ Suprer P~an~ T~ck SITE CONCRETE , 50 OVERCAST Aml~ent Tempera~re CF} 85 Conorete Temperature 76 ~me Sampled Water Added 1:30 PM 0.0 GALS Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 AIR ENTRAINMENT (%) 3.5 Concrete Cylinder Test(s) SPECIFICATIONS ACTUAL (Days) T~ ~m Obs.) ~0 119 7 10/14/93 92000 3250 120 28 11/04/93 121 28 11/04/93 122 HOLD HOLD :,efmml<s and/or Di~lbut~n NATH~XN D. S~ngCtR~uir~ 4000 I ROGER CRABTREE (RONE) MAIER/MIKE GARRETT (1), CITY OF COPPELL/LARRY DAVIS (1) none Engineers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Pro~-t Purci3ase Orcler FAIRWAYS OF RIVERCHASE D3-456A-01-24675-B ~ OCT. 7: 199q 1~ 1993 RIVERCHASE ESTATES LTD. STA: 2+40 PINEHURST DRIVE SITE CONCRETE, INC. !Supplier I Plax-ct Truck T~cket57 SITE CONCRETE I 0. 0 GALS 4:10 PM WaterAdOed iPhysical Data ACTUAL SPECIFICATIONS SLUMP (in.) 5 AIR ENTRAINMENT (%) 3.0 Concrete Cylinder Test(s) ACTUAL SPECIFICATIONS AgeI j Tot Load Coml3ressNe 513'engl~ Sb'sng¢l Required (Days) Test Date (]Ds.) P0 83s~ 87500 3100 4000 !SPe~men 123 7 10/14/93 124 28 11/04/93 t25 28 11/04/93 126 HOLD HOLD Cunng IASTM C 39 I~ea 28=7 sq. i~ ROGER C~BTREE (RONE) ~ C 31 3~=ma~ks and/or D~s~butJan NATHAN D. MAZER/MIKE GARRETT (1) , CITY OF COPPELL/LARRY DAVIS (1) Rone Engineers R o n e E n ¢ Geotechnical Consu~tan[s Ma[erials Testing Concrete Cylinder Test Report :~roiect Purcflase Order FAIRWAYS OF RIVERCHASE D3-456A-01-24675-C I OCT. 7. 1993 OCT. 15. 1993 rD RIVERCHASE ESTATES LTD. 2ND TOP FROM SOUTH END OF JOB ON THE WEST SIDE SITE CONCRETE, INC. Supp6er Ip~-~tl Truck T}cket REDI-MIX I 44884 4715 CLOUDY 76 75 4:20 PMI 0.0 GALS Physical Data ACTUAL SPECIFICA-~ONS SLUMP (in.) 2 1/2 Concrete Cylinder Test(s) SPECIFICATIONS NO. (Days) Test Date ACTUAL Obs.) 127 7 10/14/93 128 28 11/04/93 129 28 11/04/93 130 HOLD HOLD 152500 5390 Streng~ Required (ps,] 3000 IASTM C 39 IArea 28.27 sq. in. I ROGER CRABTREE (RONE) F~rk$ and/or E~-~bu~on NATHAN D. MAIER/MIKE GARRETT (1), CITY OF COPPELL/LARRY DAVIS (1)