Riverchase(3)-LR 931008Pone Engineers
Geoteohnical Consultants
Matedals Testing
Concrete Cylinder Test Report
FAIRWAYS OF RIVERCHASE
Purchase OrOer
ID'ate of Ot:~serYe4~on Ilge¢,o,q D'a~e
SEPT. 29, 1993 . OCT. 8~ 1993
D3-456A-O1-24573
ro
~RIVERCHASE ESTATES LTD.
KINGS MILL COURT
Mix NumCer IMix De~cnpdon
Weather Condi~onsCLEAR IAm b~ent Tern perature (°F) IC°ncre~e Temperature (°s
8:45 AM I 0.0 GALS
Physical Data
ACTUAL SPECIFtCA~ONS
SLUMP (in.) 7
Concrete Cylinder Test(s)
ACTUAL SPECIFICATIONS
Age J I TotLoad Comor~.s~,e S~-eng~'l St~en¢ Required
(Days) Tesl Data (lbs,) (ps~ (ps~
85000 3010 3000
;SPe~men r
No.
59 7 10/06/93
60 28 10/27/93
61 28 10/27/93
62 HOLD HOLD
Test Mernodo 39 IA/ca 28.27 Sq. in. I - ~DY WORTHEN
NAT~ D. MAIER/MIKE GARRETT (1), CITY OF COPPELL/LARRY DAVIS (1)
Rone Engineers R0neEn¢ ineers
GeotechnJcal Consultants
Materials Testing
Concrete Cylinder Test Report
FAIRWAYS OF RIVERCHASE
D3-456A-01-24573-A SEPT. 29~ 1993 OCT. 8, 1993
RIVERCHASE ESTATES LTD.
C0VENTRY, STA: 3+50
SITE OONCR.~'.Li~
supcer
ON SITE BATCH PLANT
Wearier Condit;onsCLEAR lament Temperature (°F) IC°r~c~rme Temperature (°~
10.:30 AM/ 0.0 GALS
Physicai Dar8
ACTUAL SPECIFICATIONS
SLUMP (in.) 2
Concrete Cyiinder Test(s)
ACTUAL SPECIFICATIONS
NO. (gays) Test g~4e
93500 3310 3000
63 7 10/06/93
64 28 10/27/93
65 28 10/27/93
66 HOLD HOLD
Oudng M~t~od ITest Method ISt:~nct&rd ~ x ~ ~' Bngine~r~'ecrtnic~n
ASTM C 31 ASTM C 39 Nea 28~27 sq. in. RANDY WORTHEN
qema~s end/or O~:s'imbu~don
NATHAN D. MAIER/MIKE GARRETT (1) , CITY OF COPPELL/LARRY DAVIS (1)
· Rone Engineers
RoneE ngineers
Geotechnical Consultants ~t~
Materials Testing
Concrete Cylinder Test Report
Project Purchase Order
FAIRWAYS OF RIVERCHASE
D~te of Ob'servat~on
Report D'~te
Number
I OCT° 8t 1993
~SEPT. 29, 1993
D3-456A-01-24573-B .
7~IVERCHASE ESTATES LTD.
HURST DRIVE, STA: 3+00
SITE CONCR~I'~
SupCer iPmnt /Truck I'~cket
Weather Conditions IAm~:2ent Temperature (°F} I COnCl'ete Temperature (*~
CLEAR I~
~['~ e Sampled I Water Adoed
~2.:30 PM 0.0 GALS
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (in.) 1 1/2
Concrete Cylinder Test(s)
ACTUAL SPECIFICATIONS
SPe~men J Age j I ZotLoad Compr es.s~ve S~eng'~ Streng'~ Required
NO, (Oays) Test Date (lbs.) (1~ (ps0
84000 2970 3000
67 7 10/06/93
68 28 10/27/93
69 28 10/27/93
70 HOLD HOLD
NAT~ D. MAIER/MZKE GARRETT (1), CITY OF COPPELL/LARRY DAVIS (1)
Rone Engineers
GeotechnJcal Consultants
Materials Testing
Concrete Cylinder Test Report
F~IRWAYS OF RIVERCHASE
Purcflase Order
D3-456A-01-24573-C
O~eofOb~erva~on I OCT. 8! 1993
I SEPT. 29, 1993
To
RIVERCHASE ESTATES LTD.
Loc-a'bon
BILTMORE DRIVE
SITE CONCR~£'~
Supp6er JP~an~ ITruck IT}¢ket
ON SITE BATCH PLANT
Weatmer Condi6ons IAn~b~ent Temperature (°~ [Concrete Temperature
c'r,~
"~ %,~¢°'~,~ iwa''~^~°~ o. o ~A~.S
Physical Data
ACTUAL SPECIFICATIONS
SLUMP (±n.) 2
~oncrete Cylinder Test(s)
ACTUAL SPECIFICATIONS
' NO.I (Days)I Test Date (P's.) (~0 (P$']
93500 3310 3000
71 7 10/06/93
72 28 10/27/93
73 28 10/27/93
74 HOLD HOLD
NAT~ D. MAIER/MIKE GARRETT (1), CITY OF COPPELL/LARRY DAVIS (1)