Loading...
Riverchase(3)-LR 931006Pone Engineers RC 'ReeFs Geatechnical Consultants Materials Testing Concrete Cylinder Test Report FAIRWAYS OF RIVERCHASE D3-456A-01-24567 SEPT. 28r 1993 OCT. 6, 1993 To RIVERCHASE ESTATES LTD. KINGSMILL DRIVE, STA: 6+60 ~ j.'±'~ OON~FdS£'E Suppler Ip[arr~~ jT ok ON SITE BATCH PLANT CLEAR 76 .Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) i 1/2 Concrete Cyiinder Test(s) ACTUAL SPECIFICATIONS NO. (Days) Test Date 85000 3010 4000 39 7 10/05/93 40 28 10/26/93 41 28 10/26/93 42 HOLD HOLD ;unng Memod jTest Memod jSU~n~ard ~' x ~ I~ngineer , ~er~arks and/or D~nb~don NATHAN D. MAIER/MIKE GARRETT (1) , CITY OF COPPELL/LARRY DAVIS (1) Rone Engineers RoneEn iReers Geotechnical Consultants Materials Testing Concrete Cylinder Test Repor~ FAIRWAYS OF RIVERCHASE I SEPT. 28, 1993 D3-456A-01-24567-A OCT. 6, 1993 rD RIVERCHASE ESTATES LTD. BERKSHIRE LANE, STA: 11+00 SITE C(~CR~'3.'~: ON SITE BATCH PLANT CLEAR I 74 Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) i Concrete Cylinder Test(s) ACTUAL SPECIFICATIONS (Days) T~ Date 43 7 10/05/93 44 28 10/26/93 45 28 10/26/93 46 HOLD HOLD 86000 3040 4000 Cunng Method ITest Me.od ISt:~n~ard S' x I~' ~.ngineer/Tecnni~an ASTM C 31ASTM C 39 ;¢ea 28,27 sq. in. TED NICHOLAS (RONE) NAT~ D. MAIER/MIKE GARRETT (1) , CITY OF COPPELL/LARRY DAVIS (1) Rone Engineers GeotechnJcal Consuitants Ma£enals Testing Concrete Cylinder Test Report pr oiec~ Purchase O~der FAIRWAYS OF RIVERCHASE D3-456A-O1-24567-B I SEPT. 28, 1993 OCT. 6. 1993 To RIVERCI-L~SE ESTATES LTD. BERKSHIRE LANE, STA: 15+25 SITE CONCR~-J.'~ Supp6er JP~t Truck FScket ON SITE BATCH PLANT . Near, er Conditions Amb~st Temperature (~F~ Concrete Temperan~re (°,~ CLEAR 7 2 hysi al Data ACTUAL SPECIFICATIONS SLUMP (in.) 1 Concrete Cylinder Test(s) ACTUAL SPECIFICATIONS . _ NO. (Days)I Test D~,te dD$.) [ (pS0 (pSl'~ 47 7 10/05/93 94000 3330 4000 48 28 z0/26/93 49 28 10/26/93 50 HOLD HOLD AS~C31 ASTMC39 A~eaaS.2?s~.in. TED NICHOLAS (RONE) Remacks a~d/or D~tn~urt~on NATHAN D. MAIER/MIKE GARRETT (1) , CITY OF COPPELL/LA1LRY DAVIS (1) Rone .g nee,s RoneEn Jneers Geotechnical Consultants Materials Testing Concrete Cylinder Test Report Proiect Purchase Order FAIRWAYS OF RIVERCHASE Number I D~te o~ Observ~on D3-456A-01-24567-C 8[~. lB, 1993 O~. 6r To RIVERCHASE ESTATES LTD. BERKSHIRE LANE, STA: 18+00 SITE CONCR~'i'~: 3uppiier P~F~,~ Thick Ticket ON SITE BATCH PLANT ~4ix Numc>er IML~ DeSCnp~:on Physical Data ACTUAL SPECIFICATIONS SLUMP (in.) 1 Concrete Cylinder Test(s) ACTUAL SPeCimenI Age j iot Load I Compressrve No. ((Days) T~ Date Obs.} SPECIFICATIONS Streng~ Required (ps,~ 51 7 10/05/93 52 28 10/26/93 53 28 10/26/93 54 HOLD HOLD 84000 2970 4000 Ounng Memod ITe~ Med',c~ JS~dard ~' × ~' ~ngineer/Tecnnic~an ASTMOal ASTMC3~ /~ea 28.27 sq. in. TED NICHOLAS (RONE) ~ernarks and/or D~tn-ouion NATHAN D. MAIER/MIKE GARRETT (l), CITY OF COPPELL/LARRY DAVIS (l) 4 Bone E~gineers Rone Engineers RoneE ineers Geotechnioal Consultants ~ ~1~ Materials Testing Concrete Cylinder Test Report FAIRWAYS OF RIVERCHASE D3-456A-01-24567-D SEPT. 28, 1993 OCT. 6, 1993 rD RIVERCHASE ESTATES LTD. 'Loc. a~on CUTTINGHAM COURT, STA; 23+00 SITE Suppler I p~ql [Truck ¢~cket ON SITV. BATCH PLANT CLEAR 72 Physical i Wate¢ Adored Data ACTUAL SPECIFiCA~ONS SLUMP (in.) 1 ;oncrete Cylinder Test(s) ACTUAL SPECIFICATIONS Te~t Date 63000 2230 No, Age (Days) 55 7 10/05/93 56 28 10/26/93 57 28 10/26/93 58 HOLD HOLD 400O Cu"ng M.t~Od ITest Me.od ISt~nd~d ~' × 1~ ~gineer/Tecnn*cian ASTMOSl ASTMOSS IA~ea2S~Tsq'in' TED NICHOLAS (RONE) NATHAN D. MAIER/MIKE GARRETT (1) , CITY OF COPPELL/LA_~Y DAVIS (1)