Loading...
Riverchase(3)-LR 930923Rone Eng'jneers GeatechnJcSJ Consultants M ai;edais Testing Roi ineers Concrete Cylinder Test Report FAIRWAYS OF RZVERCHASE Date o~ Ot~servaJSon S ~lpq~. I AUGUST 25, 1993 D3-456A-01-24154 To RIVERCHASE ESTATES LTD. SOUTH INLET LINE A-l, STA: 0+66 2~; lgqq SupCer REDI-MIX , 125 46673 · 83 SUNNY Water Added 3::00 PM 0.0 GALS jPhysicaJ Data ACTUAL SPECIFICATIONS SLUMP (in.) 1 1/2 Concrete Cylinder Test(s) SPECIFICATIONS SPemmen j 24 7 09/01/93 98000 3470 25 28 09/22/93 117500 4160 .26 28 09/22/93 111500 3940 ACTUAL I J r°' Load I c°mpr~" s~n¢~ s~-~ngln Required Age T~ D~te ~s~ (Days) Cbs.) ~ 3000 AST~C31 ASTMC3S A~ea 28-27 sq. in. I ' TED NICHOLAS (RONE) Flemancs end/or D~lnbution NATHAN D. MAIER/MIKE GARRETT (1), CITY OF COPPELL/LARRY DAVIS (1) Rone Engineers 214 241 5174 SEP 24 'DB 03:00PM ROME EMGIMEER POst-It'" brand fax tranemittal memo 7671 'Copt, i I; Phor~e # P.1 SEP 24 '93 03:01PM ROME EMG~ER Lo~tbn .I I I .1 Z2