Loading...
Riverchase(3)-LR 930909Rone Engineers Geotechnical Consultants Materials Testing Roi ineers iConcrete Cylinder Test Report iPtoject FAIRWAYS OF RIVEROHASE Numbe¢ Itate of Obsem-at~on D3-456A-01-24210 AUGUST 5, 1993 SEPT. 9, 1993 RIVERCHASE ESTATES LTD. Loca~on NORTH HEAD WALL Suppler Mix Numoer Ptan~ TnJck 'Scket Mix Desc~pt~on ~Veat~her Conditions jAm~em Tem~rature ?F)IConcrete Temperature (°F) hysica[ Data ACTUAL SPECIFICA~ONS Ooncrete Cylinder Test(s) AC~AL J SPECIFICATIONS No. (D~ys) T~ Date 3000 27 28 09/02/93 153000 5410 28 28 09/02/93 141000 4990 29 HOLD HOLD Cunng Memc~ jTes~ Method Is~ard 6" x i~' IEngineer NAT~ D. MAIER/MIKE GARRETT (1), CITY OF COPPELL/LARRY DAVIS (1) * All information is as supplied by cylinder fabricator. · Rone Engineers