To: Steve Duvall / M & P Nexlevel TX From: Rhonda Brothers / Engineering Dept.
Fax: 281-477-6054 Date: January27,2005
Phone: Pages: 1 (including cover sheet)
Re: Damage claim from Loop C - Phase 1 CC: Keith Marvin, P.E.
[] U~jent FIFor Review [] Please Comment X Please Reply [] As Requested
,Commen~:
See the memo below for detailed information on the damage report...
Please contact Larry Davis at 469-576-7707 before the repair work is to be done so that he can be
present also.
IF YOU DO NOT RECEIVE ALL OF THE PAGES PLEASE CALL (972) 304-3679
"City of Coppell Engineering - Excellence By Design"
-R-hor~da B rot~,~S --~: Dam age fi'°m M°0r---e- R~-~~r~'~it f°r Time warneT- ...... ~ --_ _._i Page1
From:
To;
Date:
Subject:
Keith Marvin
Brothers, Rhonda
1/27/2005 11:49:10 AM
Re: Damage from Moore Rd permit for Time Warner
They were on the east side. If I said west, I was mistaken. Go ahead with the memo.
Thanks.
>>> Rhonda Brothers 1/27/2005 11:09:49 AM >>>
I was doing the memo to Larry with a cc: to Danny when I discovered the location of 603 Bethel School is
on the $outheaet corner of the intersection of Moore and Bethel School. if TW did all their work on the
west side of Moore, could it have been another contractodpermit who caused the damage? She said the
contractor was digging up all along Moore from Belt Line north and they dug huge, deep holes in her yard.
I don't know of anyone else who worked in that area at that time. Should I go ahead & do the memo and
report the damage?