SS9901-CS050112Turner Collie Braden Inc. TRANSMITTAL To: From: Date: Job No.: Subject: See Distribution ~ Erika K. Cooper, P.- E. - TCB January 12, 2005 052 131124.0001 04000.A123 (2.1) Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements DeForest & Sandy Lake Wastewater Lift Stations Shop Drawing Review Comments Submittal No. 04-44-014A (Flowable Fill) Submittal No. 04-44-015A (Class B Concrete) Submittal No. 04-44-016 (Rebar) Submittal No. 04-44-020A (Sandy Lake Pumps) Submittal No. 04-44-02 lA (Handrail) Submittal No. 04-44-023A (Dampproofing and Paint) TCB has the following comments on these submittals: Description Status Comment Flowable Fill No Exception Taken Class B Concrete No Exception Taken Rebar Make Corrections Noted · Clearance for rebar on top of base slab should be 3" (not 2" as shown) · Clearance for rebar on inside wet well walls should be 3" except for baffle wall (2" clearance) · Clearance for rebar on outside wet well walls is 2" as shown Sandy Lake Pumps Revise and Resubmit · Sandy Lake Pumps - 8" discharge and 10" suction · Ball check valve body material must conform to ASTM C126 Class B · Provide 4-pump alternator configured for 3 pumps alternating (4th pump is future) · Provide 4th motor starter with circuit breaker and related items per Sheets SE-2, SE-3 and SE-4 · Sump pumps in submittal are shown as three-phase; Sheet SE-2 shows single- phase units. Either pumps or motor starters need to be adjusted DeForest and Sandy Lake Wastewater Lift Stations 01/12/05 Page 2 Description Status Comment Handrail Make Corrections Noted · Contractor to verify dimension for Lift Station grating balcony rail · Grating thickness is 1-3/4" · Channel size for Lift Station grating balcony rail is W10x49 · Are the posts for the Lift Station grating balcony rail mounted on the concrete slab? Dampproofing and Rejected · Hatch must be Bilco Type K Single Paint Leaf per Detail 4 on Sheet SS-1 · Verify openings for Neenah covers in field When you re-submit the shop drawings, please address all comments and submit eight (8) copies to this office. Distribution: [X] 2 copies of submittal to the City [×] 4 copies of submittal to Can-Fer Construction Company, Inc. [X] 2 copies of submittal to TCB file [ ] Other