SS9901-CS041230Turner Collie (,_0'Braden Inc. TR N SMITTAL
To:
From:
Date:
Job No.:
Subject:
See Distribution ~.c/
Erika K. Cooper, P.E.- TCB
December 30, 2004
052 131124.0001 04000.A123 (2.1)
Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements
DeForest & Sandy Lake Wastewater Lift Stations
Shop Drawing Review Comments
Submittal No. 04-44-003A (Door Hardware Schedule)
Submittal No. 04-44-004A (Metal & FRP Doors)
TCB has the following comments on these submittals:
Description Status Comment
Door Hardware Revise and Resubmit * See Sheet SS-3 for dimensions for Door
Schedule D I
· Hinges for D1 and D2 to be 304 S.S.
· Include frame for Door D2
· Confirm door dimensions for D2 with
new frame
Metal & FRP Doors Revise and Resubmit · See Sheet SS-3 for dimensions for Door
D1
· Door D1 to be LHR (open in to Ground
Level, away from spiral stairway)
· Match existing door for hand and swing
for Door D2
· Include frame for Door D2
· Confirm door dimensions for D2 with
new frame
When you re-submit the shop drawings, please address all comments and submit eight (8) copies to
this office.
Distribution:
[X] 2 copies of submittal to the City
[X] 4 copies of submittal to Can-Fer Construction Company, Inc.
[X] 2 copies of submittal to TCB file
[ ] Other