Loading...
SS9901-CS041230Turner Collie (,_0'Braden Inc. TR N SMITTAL To: From: Date: Job No.: Subject: See Distribution ~.c/ Erika K. Cooper, P.E.- TCB December 30, 2004 052 131124.0001 04000.A123 (2.1) Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements DeForest & Sandy Lake Wastewater Lift Stations Shop Drawing Review Comments Submittal No. 04-44-003A (Door Hardware Schedule) Submittal No. 04-44-004A (Metal & FRP Doors) TCB has the following comments on these submittals: Description Status Comment Door Hardware Revise and Resubmit * See Sheet SS-3 for dimensions for Door Schedule D I · Hinges for D1 and D2 to be 304 S.S. · Include frame for Door D2 · Confirm door dimensions for D2 with new frame Metal & FRP Doors Revise and Resubmit · See Sheet SS-3 for dimensions for Door D1 · Door D1 to be LHR (open in to Ground Level, away from spiral stairway) · Match existing door for hand and swing for Door D2 · Include frame for Door D2 · Confirm door dimensions for D2 with new frame When you re-submit the shop drawings, please address all comments and submit eight (8) copies to this office. Distribution: [X] 2 copies of submittal to the City [X] 4 copies of submittal to Can-Fer Construction Company, Inc. [X] 2 copies of submittal to TCB file [ ] Other