Loading...
SS9901-CS041229TurnerCollie( Braden inc TR NSYnTTAL To: From: Date: Job No.: Subject: See Disthbution ~ Erika K. Cooper, P.E. - TCB December 29, 2004 052 131124.0001 04000.A123 (2.1) Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements DeForest & Sandy Lake Wastewater Lift Stations Shop Drawing Review Comments Submittal No. 04-44-012A (Truss Drawings) TCB has the following comments on these submittals: Description Status Comment Tress Drawings Make Corrections Noted · Verify question regarding bearing angle. · Verified dimensions per Contractor request. When you re-submit the shop drawings, please address all comments and submit eight (8) copies to this office. Distribution: [X] 2 copies of submittal to the City [X] 4 copies of submittal to Can-Fer Construction Company, Inc. [X] 2 copies of submittal to TCB file [ ] Other