SS9901-CS041229TurnerCollie( Braden inc TR NSYnTTAL
To:
From:
Date:
Job No.:
Subject:
See Disthbution ~
Erika K. Cooper, P.E. - TCB
December 29, 2004
052 131124.0001 04000.A123 (2.1)
Deforest and Sandy Lake Wastewater Lift Stations and Force Main Improvements
DeForest & Sandy Lake Wastewater Lift Stations
Shop Drawing Review Comments
Submittal No. 04-44-012A (Truss Drawings)
TCB has the following comments on these submittals:
Description Status Comment
Tress Drawings Make Corrections Noted · Verify question regarding bearing angle.
· Verified dimensions per Contractor
request.
When you re-submit the shop drawings, please address all comments and submit eight (8) copies to
this office.
Distribution:
[X] 2 copies of submittal to the City
[X] 4 copies of submittal to Can-Fer Construction Company, Inc.
[X] 2 copies of submittal to TCB file
[ ] Other