WA0101-ES040413JOHN W. B1RKHOFF, P.E.
RONALD V. COI~,VAY, P.E.
GARY C. HENDRICKS, P.E.
JOE R. CARTER, P.E.
PAUL A. CAP. LINE, P.E.
MATT HICKEY, P.E.
DOUGLAS K. SHOWERS, P.E.
BIRKHOFF, HENDRICKS & CONWAY, L.L.P.
CONSULTING ENGINEERS
7502 Greenville Ave.,//220 Dallas, Texas 75231 Fax (214) 361-0204
April 13, 2004
Phone(214)361-7900
Ms. Suzan C. Taylor, C.I.P. Coordinator
City of Coppell
Post Office Box 478
Coppell, Texas 75019
gez
State Highway 121 Water Line (Coppell Road to Denton Tap Road)
Project No. WA 01 - 01
Permanent and Temporary Easements
Dear Ms. Taylor:
Please find enclosing two sets each of the plats and field note descriptions for the permanent water line
easements and the temporary construction easements required for construction of the State Highway 121
Water Line (Coppell Road to Denton Tap Road). The easements included cross the following properties:
Coppell Greens Phase II Addition
FWRM lnc.
Cabinet R, Page 104 & 105 (LR of DC)
Volume 97122, Page 5267 (LR of DC)
We are available to discuss this project further at your convenience.
Enclosures
cc:
~r. Kenneth Griffin, P.E.
City Engineer / Director of Public Works