Loading...
ST9301-ES020225T H E · C I T Y 0 F COPPELL Febmary25,2002 Robert & Heather King C/O Isla Creighton 5956 Sherry Lane, Suite 100 Dallas, TX 75225 RE: Sandy Lake Road Project #ST 93-01 / Parcel 14, 14SE & 14DE Dear Mr. & Mrs. King: I apologize for the length of time it has taken me to follow-up with you conceming the acquisition of the easements. Subsequent to the time in which you signed the agreement for the offer of $2,846 for the acquisition of Parcel 14 and 14SE from your property, it was discovered that a drainage easement was also needed from your property. This project is being designed by Dallas County and after numerous telephone calls and meetings with Dallas County, the City of Coppell received information concerning the drainage easement from your property on February 7, 2002. During that timeframe there were also changes made to the project to reduce the amount of the slope easement necessary from your property. The amount of required right-of-way is the same, but again the necessary slope easement has been reduced and a drainage easement has been included at the southwest comer of your property. The drainage easement is necessary to collect water from your property to avoid ponded water and to discharge that water into a drainage system within Sandy Lake Road. Using the revised slope easement and the inclusion of the drainage easement, the Ci~' of Coppell needs to revise our offer for the necessary right-of-way and easements from your property to the following: 1. Acquisition of permanent right-of-way at $2.00/sq. ft. x 592 sq. fi. 2. Acquisition of temporary slope easement at $0.50/sq. ft. x 1140 sq.ft. 3. Acquisition of drainage easement at $0.50/sq.ft. x 421 sq.ft. $1,184.00 $570.00 $210.50 Toml $1,964.50 Typically, the City of Coppell pays approximately one-half the value of the right-of-way for a drainage easement. In this case that would be one dollar per square foot. However, the engineer for this project has written the slope easement to contain the area of the slope easement and the area of the drainage easement. In other words, he has overlaid the slope easement with the drainage easement. In essence, with the value of the slope easement I am also paying for the portion of the drainage easement that overlays the slope easement. I am making up the difference to one dollar by paying an additional fifty cents per square foot for the drainage easement. In other words, there is really only 719 square feet of slope easement which is truly just slope easement. The other 421 feet of slope easement is also the same area as the drainage easement. 2~ PARKWAY ~, p O BOX 47B W COPPELL TX 75OI <~ ~, TEL 972/462 0022 *, FAX 972/304 3673 Previously, the City of Coppell had offered $2,846 for the acquisition of property. Because of changes in construction plans the amount of the slope easement necessary for construction of this project was reduced. That in turn reduced the amount of the offer to you from the City for the acquisition of your property. I apologize for the delay in responding to you concerning the acquisition of your property. If you should need any additional clarification on the revised offer please contact this office at 972/304-3686. If the above offer is acceptable please sign below and return to me. Once I have received the letter, I will start the process for payment of the $1,964.50. When the check has been processed we can arrange a mutually agreeable time to meet to notarize the documents in exchange for the check. Thank you for your patience and if you should have any questions please feel free to contact this office. Sincerely, A Director of Engineering/Public Works In Agreement Robert King Heather King