Loading...
MA 02/03-LR040604 Hooper Engineering L boratories, Inc. Construction Mater~l~ Tssting REPORT OF CONCRETE TESTS [ JOB NO.: 02.1077 / CLIENT: Pavement Services Corp. ~ DATE: 4 June 2004 PROJEC~ect, Job ~3-0~7 SUPPLIER: Beall LOCATION OF POUR SET 1: Alley paving replacement at 421 Sandy Knoll: from north end to approx. 30' south of north end LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET2 MIX NO. 340L1504 Truck No. 234 Cement Ticket No. 13628301 Flyash Time Batched 9:33am Sand Time Sampled 10:40am in. Concrete Temp. (ASTM C1064) 90°F 1.0 in. Air Content (ASTM C231) 5.0% Water Unit Weight (ASTM C13e} Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Stren.gth 28-Day {ASTM C 143) psi Strength 402 4.00 7 06/11/04 103,200 3650 403 4.00 28 07/02/04 137,400 4860 404 4.00 28 07/02/04 139,~00 4920 28-Day Average 489Q 4OOO TECHNICIAN: DISTRIBUTION: CDJ (9:30am-11:30am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148