Loading...
MA 02/03-LR040415Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project, Job 03-007 LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02,1077 DATE: 1 5 April 2004 SUPPLIER: image Alley paving behind 791 Lakeview Drive (entire patch) SAMPLE DATA: SET 1 SET 2 MIX NO. 6 Sks. Truck No. 13 Cement Ticket No. 27231 Flyash Time Batched 7:26am Sand Time Sampled 8:10am Concrete Temp. (ASTM C10641 69°F 1.0 in. Air Content [ASTM C231) 4.6% Water Unit Weight (ASTM C1381 Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) C¢inder Slump Age Test Total Load Compressive Required Number inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 399 4.75 7 04/22/04 400 4,75 28 05/13~04 401 4,75 28 05/1 3~04 106,100 3750 145,500 5150 144,800 5120 28-Day Average 5140 4OOO TECHNICIAN: DISTRIBUTION: RJW (7:30am-9:30am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148