Loading...
MA 02/03-LR040408Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project, Job 03-007 LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: JOB NO.: 02.1077 DATE: 8 April 2004 SUPPLIER: Beall Alley paving replacement at 175 Simmons, from approx. 40' west of east end to east end SAMPLE DATA: SET 1 Truck No. 111 Ticket No. 13526994 Time Batched 10:06am Time Sampled 11:15am Concrete Temp. (ASTM C10641 78°F Air Content (ASTM C231) 4.0% Unit Weight (ASTM C138) SET2 MIX NO. 340L1504 Cement Flyash Sand 1.0 in: Water Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS {ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day [ASTM C143) psi Strength 393 4.00 7 04/15/04 394 4.00 28 05/06/04 395 4.00 28 05/06/04 116,200 4110 153,800 5440 145,900 5160 28-Day Average 5300 4OOO TECHNICIAN: DISTRIBUTION: CDJ (10:30am-12:30pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148