Loading...
MA 02/03-LR040407Hooper Engineering Laboratories, Inc. CLIENT: PROJECT: Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Pavement Services Corp, City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: ASTM D 698 STANDARD PROCTOR: 1) Cement Treated Base 1) 120.0 pcf ~ I 1,0% Moisture MOISTURE PROCTOR LIFT CONTENT % LOCATION DATE: 7 April 2004 Alley Paving Replacement @ 175 Simmons 200) approx. 50' W of E end 1 201) approx, 150' W of E end 1 202) approx. 50' E of W end 1 JOB NO.: 02.1077 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % CTB 12.9 117.9 98.3 CTB 12.2 119.5 99.6 CTB 9,4 129,6 108.0 95+ TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148