Loading...
MA 02/03-LR040401Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 1 April 2004 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Alley paving behind 604 Villawood Drive @ 30'-60' east of west end of patch LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. Ticket No. 89037454 Time Batched 11:03am Time Sampled 11:50am Concrete Temp. (ASTM C1064) 75°F Air Content (ASTM C231) 4.1% Unit Weight (ASTM C13a) SET 2 MiX NO. Cement Sand in. 1.0 in. Water Admix //1 Admix ~2 AEA COMPRESS/VE STRENGTH TESTS (ASTM C3a) (Standard 6 inch x 1 2 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 384 4.50 7 04~08~04 126,400 4470 385 4.50 28 04/29~04 146,$00 5170 386 4.50 28 04~29~04 14~,50.0. 5220 28-Day Average 519¢ 4000 TECHNICIAN: DISTRIBUTION: RJW (11:30am-1:30pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. CLIENT: PROJECT: Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Pavement Services Corp. City of Coppell Street Repair Project Job #03-007, Coppeli, TX 1 ) Cement Treated Base 1) 120.0 pcf ~b 11.0% Moisture MATERIAL DESCRIPTION: ASTM D 696 STANDARD PROCTOR: MOISTURE LOCATION PROCTOR LIFT CONTENT % Alley Pavin~q Reolacement (~ 183 Newport 194) approx. 25' S of N end 1 Fin. Sub. 7.1 195) approx. 25' E of W end 1 Fin. Sub. 6.9 196) approx. 10' E of W end 1 Fin. Sub. 7.8 DATE: 1 April 2004 JOB NO.: 02.1077 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % 128,0 106.6 95+ 130.9 109.1 129.5 107.9 TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148