Loading...
MA 02/03-LR040331Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project, Job 03-007 LOCATION OF POUR SET 1: LOCATION OF POUR SET 2: SAMPLE DATA: Truck No. Ticket No, 89037425 Time Batched 10:55am Time Sampled 11:50am Concrete Temp. (ASTM C1064) 72°F Air Content (ASTM C231) 4.5% Unit Weight (ASTM C1 JOB NO.: 02.1077 DATE: 31 March 2004 SUPPLIER: Beall Alley paviang behind 609 and 613 Wellington Drive at 0'-25' north of south end of paving replacement SET1 SET2 MIX NO, 340L1504 117 Cement Flyash Sand in. 1.0 in. Water Admix //1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143t psi Strength 381 4.75 7 04/07104 382 4.75 28 04~28~04 383 4.75 28 04/28~04 106,100 3750 125,400 4440 125,000 442Q 28-Day Average 4430 4000 TECHNICIAN: DISTRIBUTION: RJW (11:00am-1:00pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214).351-6419 Fax (214) 351-5148