MA 02/03-LR040331Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF CONCRETE TESTS
CLIENT: Pavement Services Corp.
PROJECT: City of Coppell Street Repair Project, Job 03-007
LOCATION OF POUR SET 1:
LOCATION OF POUR SET 2:
SAMPLE DATA:
Truck No.
Ticket No, 89037425
Time Batched 10:55am
Time Sampled 11:50am
Concrete Temp. (ASTM C1064) 72°F
Air Content (ASTM C231) 4.5%
Unit Weight (ASTM C1
JOB NO.: 02.1077
DATE: 31 March 2004
SUPPLIER: Beall
Alley paviang behind 609 and 613 Wellington Drive at
0'-25' north of south end of paving replacement
SET1 SET2 MIX NO, 340L1504
117 Cement
Flyash
Sand
in.
1.0 in.
Water
Admix //1
Admix //2
AEA
COMPRESSIVE STRENGTH TESTS (ASTM C39)
(Standard 6 inch x 12 inch cylinder)
Cylinder Slump Age Test Total Load Compressive Required
Number Inches Days Date Pounds Strength 28-Day
(ASTM C143t psi Strength
381 4.75 7 04/07104
382 4.75 28 04~28~04
383 4.75 28 04/28~04
106,100 3750
125,400 4440
125,000 442Q
28-Day Average 4430
4000
TECHNICIAN:
DISTRIBUTION:
RJW (11:00am-1:00pm)
(1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214).351-6419 Fax (214) 351-5148