Loading...
MA 02/03-LR040302Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 2 March 2004 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, southbound Marlee at 160'-170' south of Alendale St. LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. 340L1504 Truck No. 126 Cement Ticket No. 89036306 Flyash Time Batched 8:06am Sand Time Sampled 9:05am in. Concrete Temp. (ASTM C1064) 60°F 1.0 in. Air Content IASTM C231) 4.6% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 378 4.00 7 03/09/04 379 4.00 28 03/30/04 380 4.00 28 03/30/04 121,200 4290 145~90Q 150,000 5310 28-Day Average 5240 4OOO TECHNICIAN: DISTRIBUTION: TMC (7:30am-10:30am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148