Loading...
MA 02/03-LR040220Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 20 February 2004 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, westbound Southwestern St. at approx. 80'-100' east of second entrance to 652 Southwestern SET2M,× NO. 340L1504 SAMPLE DATA: SET 1 Truck No. 203 Cement Ticket No. 13623554 Flyash Time Batched 7:17 am Sand Time Sampled 8:00am in. Concrete Temp. (ASTM cloe4) 57°F 1.0 in. Air Content (ASTM C2311 3.2% Water Unit Weight (ASTM C1381 Admix #1 Admix #2_ AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C1431 psi Strength 372 5.00 7 02/27/04 110,100 3890 373 5.00 28 03/19/04 138,200 4890 374 5.00 28 03/19/04 140,400 49Y0 28-Day Average 4930 4OOO TECHNICIAN: DISTRIBUTION: TMC (7:15am-9:15am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148