Loading...
MA 02/03-LR040219Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Pavement Services Corp. DATE: PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: LOCATION OF POUR SET 1: Paving, alley behind 544 Shadowcrest LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 126 Cement Ticket No. 89035998 Flyash Time Batched 9:44am Sand Time Sampled 11:00am in. Concrete Temp. IASTM C1064~ 61 °F 1.0 in. Air Content (ASTM C231} 5.3% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 340L1504 02.1077 19 February 2004 Beall COMPRESSIVE STRENGTH TESTS (ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 369 5.50 7 02/26/04 102,000 3610 370 5.50 28 03/1 8/04 1Si, 700 4660 371 5.50 28 03/1 8~04 134,500 4~60 28-Day Average 4710 4000 TECHNICIAN: DISTRIBUTION: MFM (10:30am-12:30pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148