Loading...
MA 02/03-LR040217Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Pavement Services Corp. DATE: 17 February 2004 PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: 1 ) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf L~ 11.0% Moisture JOB NO.: LOCATION PROCTOR LIFT MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 18t) 182) 183) Alley Pavement Replacement ~ 544 Shadowcrest approx. 50' N of Shad0wcrest approx. 40' W of E end approx. 30' E of W end 1 CTB 9,2 127.2 106.0 1 CTB 8,6 132.8 110.7 1 CTB 8,3 133.2 111.0 95+ TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148