MA 02/03-LR040217Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Pavement Services Corp.
DATE: 17 February 2004
PROJECT: City of Coppell Street Repair Project
Job #03-007, Coppell, TX
MATERIAL DESCRIPTION: 1 ) Cement Treated Base
ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf L~ 11.0% Moisture
JOB NO.:
LOCATION PROCTOR LIFT
MOISTURE DRY PERCENT REQUIRED
CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
18t)
182)
183)
Alley Pavement Replacement ~
544 Shadowcrest
approx. 50' N of Shad0wcrest
approx. 40' W of E end
approx. 30' E of W end
1 CTB 9,2 127.2 106.0
1 CTB 8,6 132.8 110.7
1 CTB 8,3 133.2 111.0
95+
TECHNICIAN: CDJ
DISTRIBUTION: (1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148