MA 02/03-LR040127Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Pavement Services Corp.
DATE: 27 January 2004
PROJECT: City of Coppell Street Repair Project
Job #03-007, Coppell, TX
MATERIAL DESCRIPTION: 1) Cement Treated Base
JOB NO.: 02,1077
ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11.0% Moisture
LOCATION PROCTOR
MOISTURE DRY PERCENT REQUIRED
LIFT CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
176)
177)
Alley Pavement Reolaement L~ 446 Clear Creek
approx. 10' W of E end 1
approx, 15' E of W end
CTB 12.5 120.7 100.6
CTB 12.8 117,8 98,1
95+
TECHNICIAN: CDJ
DISTRIBUTION: (I) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148