Loading...
MA 02/03-LR040109Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Pavement Services Corp. DATE: PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: LOCATION OF POUR SET 1: Alley paving at intersection of alley behind 156 Highland Meadow Circle LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 Truck No. 126 Ticket No. 89034937 Time Batched 1:43pm Time Sampled 2:50pm Concrete Temp. IASTM C1064) 59°F Air Content (ASTM C231) 4.6% Unit Weight (ASTM C138i SET 2 02.1077 9 January 2004 Beall Cement Flyash Sand ir~. 1.0 in. Water Admix #1 Admix //2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 324 3.50 7 01/16/04 325 3.50 7 01/16/04 326 3.50 14 01/23/04 327 3.50 14 01/23/04 328 3.50 28 02/06/04 329 3.50 28 02/06/04 125,500 4440 130,700 4620 135,000 4770 137,500 4860 163,400 5790 157,000 5550 28-Day Average 5670 4000 TECHNICIAN: DISTRIBUTION: RJW (l:30pm-4:00pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148