Loading...
WA0001-CS000322SHIMEK, JACOBS & FINKLEA, L.L.P. CONSULTING ENGINEERS 8333 Douglas Avenue, #820 RONALD V. CONWAY, P.E. JOHN W. BIRKHOFF, P.E. JOE 1~ CARTER, P.E. GARY C, ItENDRICKS, P.E. PAUL A. CARLINE, P.E. MATT HICKEY, P,E. ROSS L. JACOBS, P.E. L C. FINKLEA, P.E. Dallas, Texas 75225-5816 Fax (214) 361-0204 March 22, 2000 Phone (214) 361-7900 Mr. Larry Davis City of Coppell Post Office Box 478 Coppell, Texas 75019 Re: 1.5 Million Gallon Elevated Storage Tank Repaint Project Photos Dear Mr. Davis: We are enclosing one set of prints of the project photos taken by Advantage Contract repainting of the 1.5 Million Gallon Elevated Storage Tank. This set is for your recor Sine el Enclosure cc: Mr. Kenneth M. Griffin, P.E. · c. for ADVANTAGE CONTRACT SERVICES, INC. 7150 ALMEDA GENOA ROAD, HOUSTON, TEXAS 77075 (713) 991-0747; FAX (713) 991-3939 SUBMITTAL LOG for Repainting of the 1.5 mg E.S.T. Interior for The City of Coppelt, Texas Submittal No. 1 2 3 4 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 Description ConsTxuction Schedule and Narrative Submi~al Date 02/21/00 Schedule of Values 02/21/00 Plan of Work 02/28/00 Project Photographs 03/15/00 Blast Media - PDS 02/21/00 Dehumidi~cation 02/21/00 Paint PDS 02/28/00 Shop Drawing - Butterfly Valve inc. all SCADA Connections 02/29/00 Disinfecting Procedure 02/28/00 Review Date Status A A A A A A A A ADVANTAGE CONTRACT SERVICES, INC. 7150 ALMEDA GENOA ROAD, HOUSTON, TEXAS 77075 (713) 991-0747; FAX (713) 991-3939 Submitted By: Project Number: Advantage Contract Services, Inc. WA00-01 Re: Repainting of the 1.5 Million Gallon Elevated Storage Tank Interior Advantage Contract Services, Inc. Alhante9^ C ; Cc,vices, Inc. has review,-d ~.II pads OI Iltl Ittached Su' n!L;:l end has determined that ~ ~3 in complia~ with aft per;;acnt Contract Specifications ~or' d;~ refere~