Loading...
MA 02/03-LR031112Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: CLIENT: Pavement Services Corp. DATE: PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: LOCATION OF POUR SET 1: Paving, alley south of 487 Clear Creek Lane LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 203 Cement Ticket No, 89033112 Flyash Time Batched 9:04am Sand Time Sampled 10:15am in. Concrete Temp. (ASTM C1064) 83°F 1.0 in. Air Content IASTM C231) 4.4% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 340L1504 02.1077 12 November 2003 Beall COMPRESSIVE STRENGTH TESTS (ASTM C391 (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number inches Days Date Pounds Strength 28-Day (ASTM Cl 43) psi Strength 294 5.25 7 11/19/03 295 5.25 7 11/19/03 296 5.25 14 11/26/03 297 5.25 14 11/26/03 296 5.25 28 12/10/03 299 5.25 28 12/10/03 103,200 3650 102,400 3620 113,400 4010 114,400 4050 128,100 4530 129,600 4580 28-Day Average 4560 4000 TECHNICIAN: DISTRIBUTION: MFM (9:45am-11:45am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148