MA 02/03-LR031111Hooper Engineering Laboratories, Inc.
Construction Materials Testing
REPORT OF IN-PLACE DENSITY TESTS
CLIENT: Pavement Services Corp.
DATE: 11 November 2003
PROJECT: City of Coppell Street Repair Project
Job #03-007, Coppell, TX
MATERIAL DESCRIPTION: 1) Cement Treated Base
JOB NO.: 02.1077
ASTM D 698 STANDARD PROCTOR: 1) 120,0 pcf @ 11,0% Moisture
LOCATION PROCTOR
Alley Pavino Reelacement
476 Clear Creek Drive
MOISTURE DRY PERCENT REQUIRED
LIFT CONTENT DENSITY COMPACTION COMPACTION
% PCF % %
155) approx. 50' W of E end 1 CTB 15.2 116.9 97.4
156) approx. 250' W of E end 1 CTB 11.5 121.8 101.5
157) approx. 50' E of W end 1 CTB 12.1 125.2 104.4
95+
TECHNICIAN: CDJ
DISTRIBUTION: (1) Pavement Services Corp.
(1) City of Coppell
2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148