Loading...
MA 02/03-LR031111Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: Pavement Services Corp. DATE: 11 November 2003 PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: 1) Cement Treated Base JOB NO.: 02.1077 ASTM D 698 STANDARD PROCTOR: 1) 120,0 pcf @ 11,0% Moisture LOCATION PROCTOR Alley Pavino Reelacement 476 Clear Creek Drive MOISTURE DRY PERCENT REQUIRED LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % 155) approx. 50' W of E end 1 CTB 15.2 116.9 97.4 156) approx. 250' W of E end 1 CTB 11.5 121.8 101.5 157) approx. 50' E of W end 1 CTB 12.1 125.2 104.4 95+ TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148