Loading...
MA 02/03-LR031031Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: PROJECT: MATERIAL DESCRIPTION: Pavement Services Corp. City of Coppell Street Repair Project Job #03-007, Coppell, TX 1) Cement Treated Base DATE: 31 October 2003 JOB NO.: 02.1077 ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf (~ 11.0% Moisture 152) 153) 154) · LOCATION PROCTOR Alley Pavino ReDlacement L~ 401 Sandy Knoll approx. 50' N of S end approx. 250' N of S end approx. 100' S of N end MOISTURE DRY PERCENT REQUIRED LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % 1 CTB 9.2 121.0 100,8 1 CTB 7.5 120.9 100.7 1 CTB 9.6 117.7 98,1 95+ TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148