Loading...
MA 02/03-LR031017Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS CLIENT: Pavement Services Corp. PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Alley paving behind 139 Glenwood @ 0'-35' south of north end of pour LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 25 Cement Ticket No. 59836 FIyash Time Batched I 1:36am Sand Time Sampled 12:15pm in. Concrete Temp. (ASTM C1064} 74°F 1.0 in. Air Content (ASTM C231) 4.9% Water Unit Weight (ASTM C13e) Admix #1 Admix #2 AEA JOB NO.: 02.1077 DATE: 17 October 2003 14001TC ~(~ COMPRESSIVE STRENGTH TESTS IASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 270 5.50 7 10/24/03 271 5.50 7 10/24/03 272 5.50 14 10/31/03 273 5.50 14 10/31/03 274 5.50 28 11/14/03 275 5.50 28 11/14/03 80,700 2850 73,500 2600 118,500 4190 114,700 4060 141,400 5000 141,600 5010 28-Day Average 5010 4000 TECHNICIAN: DISTRIBUTION: RJW (11:30am-1:30pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148 Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS CLIENT: PROJECT: MATERIAL DESCRIPTION: Pavement Services Corp. City of Coppell Street Repair Project Job #03-007, Coppell, TX 1) Cement Treated Base DATE: 17 October 2003 JOB NO.: 02.1077 ,~/~ ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf (~ 11.0% Moisture 147) 148) LOCATION PROCTOR LIFT Alley Pavino Reolacement @ 602 Raven approx, 5' west of east end I CTB approx. 10' east of west end 1 CTB MOISTURE DRY PERCENT REQUIRED CONTENT DENSITY COMPACTION COMPACTION % PCF % % 9.2 127.6 106.3 10.0 132.0 110.0 95+ TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148