Loading...
MA 02/03-LR030926Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB N0.: 02.] 077 CLIENT: Pavement Services Corp. DATE: 26 September 2003 City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall PROJECT: LOCATION OF POUR SET 1: Paving, alley behind 336 Willow Springs ~)\ LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 119 Cement Ticket No. 89031334 FIyash Time Batched 11:09am Sand Time Sampled 12:00 N in. Concrete Temp. (ASTM C10~4~ 89°F 1.0 in. Air Content (ASTM C231) 4.6% Water Unit Weight {ASTM C138) Admix #1 Admix #2 AEA 340L1504 ~) COMPRESSIVE STRENGTH TESTS (ASTM C39} (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 260 5.00 7 10/03/03 261 5.00 14 10/I 0/03 262 5.00 28 10/24/03 263 5.00 28 10/24/03 100,300 3550 108,400 3830 120,900 4280 122,800 4340 28-Day Average 4310 4000 TECHNICIAN: DISTRIBUTION: TMC (11:15am-1:15pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148