Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
MA 02/03-LR030919
Hooper Engineering Laboratories, Inc. REPORT OF IN-PLACE DENSITY TESTS Construction Materials Testing CLIENT: Pavement Services Corp. DATE: 19 September 2003 PROJECT: City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: 1) Cement Treated Base JOB NO.: 02.1077 ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11.0% Moisture LOCATION PROCTOR Alley Pavino Reolacement ~ 336 Willow Sprincis MOISTURE DRY PERCENT REQUIRED LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % 137) approx. 100' S of N existing paving 1 CTB 10.4 138) approx. 300' S of N existing paving 1 CTB 14.0 139) approx. 500' S of N existing paving 1 CTB 11.2 140) approx. 75' N of Willow Springs 1 CTB 14.3 124.9 104.1 115.4 96.1 122.5 102.0 115.4 96.1 95+ TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp, (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148