Loading...
MA 02/03-LR030328Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 28 March 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Bea[I LOCATION OF POUR SET 1: Paving patch, northbound right lane of Royal Lane, 0'-20' north of west approach for 951 Royal Lane LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 232 Cement Ticket No. 1 3611612 Flyash Time Batched 10:28am Sand Time Sampled 11:05am in. Concrete Temp. (ASTM C1064} 71 °F 1.0 in. Air Content (ASTM C231) 4.6% Water Unit Weight (ASTM C13a) Admix //1 Admix #2 AEA 340L1504 COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day {ASTM C143) psi Strength 104 4.25 7 04~04/03 105 4.25 7 04~04~03 106 4.25 14 04/11/03 107 4.25 14 04/11/03 108 4.25 28 04~25~03 109 4.25 28 04~25~03 122,300 4330 116,500 4120 144,200 5100 145,900 5090 165,600 5860 160,900 5690 28-DayAverage 5780 4000 TECHNICIAN: DISTRIBUTION: CBC (10:30am-12:30pm) (1) Pavement Services Corp, (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148