Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
MA 02/03-LR030327
6O) 61) 62) 63) Hooper Engineering Laboratories, Inc. CLIENT: PROJECT: Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Pavement Services Corp. City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: ASTM D 698 STANDARD PROCTOR: 1) Cement Treated Base 1) 120,0 pcf @ 11.0% Moisture MOISTURE PROCTOR LIFT CONTENT % LOCATION Paving Replacement ~ 951 Royal Lane middle 1 Pavinq Replacement ~ 616 Phillips Drive middle 1 Paving Replacement (~ 514 Shadowood west end 1 DATE: 27 March 2003 JOB NO.: 02.1077 east end 1 DRY PERCENT REQUIRED DENSITY COMPACTION COMPACTION PCF % % CTB 9.2 118,1 98.4 CTB 9.2 121.5 101.3 CTB 10.7 127.8 106,5 CTB 12.0 123.1 102.6 95+ TECHNICIAN: CDJ DISTRIBUTION: (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148