Loading...
MA 02/03-LR030321Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 21 March 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, eastbound lane at 518 Woodhurst LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 202 Cement Ticket No. 13611254 Flyash Time Batched 10:56am Sand Time Sampled 12:1 Opm in. Concrete Temp. (ASTM C1064) 69°F 1.0 in. Air Content {ASTM C231) 4.1% Water Unit Weight (ASTM C138) Admix //1 Admix //2 AEA 340L1504 COIV/PRESS/VE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 98 5.50 7 03~28~03 118,000 4170 99 5.50 7 03~28~03 115,700 4090 100 5.50 14 04/04/03 ~26,700 4480 lOl 5.50 14 04/04/03 127,700 4520 102 5.50 28 04/18/03 146,:~00 5~70 103 5.50 28 04/18/03 139,700 4940 28-Day Average 5060 4OOO TECHNICIAN: DISTRIBUTION: EWM (11:30am-1:30pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148