Loading...
MA 02/03-LR030314Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp. DATE: 14 March 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving, westbound lane at 604 E. Bethel School Rd. LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO. Truck No. 227 Cement Ticket No. 89022345 Flyash Time Batched 12:15pm Sand Time Sampled 1:30pm in. Concrete Temp. (ASTM C1064) 70°F 1.0 in. Air Content (ASTM C231) 4.6% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA 340L1504 COMPRESSIVE STRENGTH TESTS IASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 86 5.00 7 03~21/03 87 5.00 7 03/21/03 88 5.00 14 03/28/03 89 5.00 14 03/28/05 90 5.00 28 04/11/03 91 5.00 28 04/11/03 116,700 4130 121,600 4300 127,500 45.1Q 122,600 434Q 142,100 5030 143,700 5080 28-DayAverage 506Q 4000 TECHNICIAN: DISTRIBUTION: MFM (12:45pm-2:45pm) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148