Loading...
MA 02/03-LR03031345) 46) 47) CLIENT: PROJECT: Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF IN-PLACE DENSITY TESTS Pavement Services Corp. City of Coppell Street Repair Project Job #03-007, Coppell, TX MATERIAL DESCRIPTION: 1 ) Cement Treated Base ASTM D 698 STANDARD PROCTOR: 1) 120.0 pcf @ 11.0% Moisture LOCATION PROCTOR Pavino Replacement (~ 604 E. Bethel School Rd, middle 1 DATE: 13 March 2003 JOB NO.: 02.1077 MOISTURE DRY PERCENT REQUIRED LIFT CONTENT DENSITY COMPACTION COMPACTION % PCF % % CTB 9.5 125.7 104,8 95 + Pavino Replacement (~ 705 E. Bethel School Rd. west end 1 east end 1 CTB 9.8 129.8 108.2 CTB 9.7 134.6 112.2 TECHNICIAN: DISTRIBUTION: CDJ (1) Pavement Services Corp, (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148