Loading...
MA 02/03-LR030312Hooper Engineering Laboratories, Inc. Construction Materials Testing REPORT OF CONCRETE TESTS JOB NO.: 02.1077 CLIENT: Pavement Services Corp, DATE: 12 March 2003 PROJECT: City of Coppell Street Repair Project, Job 03-007 SUPPLIER: Beall LOCATION OF POUR SET 1: Paving on Plantation Drive, westbound lane in front of 221 Plantation Drive LOCATION OF POUR SET 2: SAMPLE DATA: SET 1 SET 2 MIX NO, 340L1504 Truck No. 210 Cement Ticket No, 13610981 Flyash Time Batched 8:47am Sand Time Sampled 10:00am in, Concrete Temp, (ASTM C1064) 75°F 1,0 in. Air Content IASTM C231} 4,6% Water Unit Weight (ASTM C138) Admix #1 Admix #2 AEA COMPRESSIVE STRENGTH TESTS (ASTM C39) (Standard 6 inch x 12 inch cylinder) Cylinder Slump Age Test Total Load Compressive Required Number Inches Days Date Pounds Strength 28-Day (ASTM C143) psi Strength 80 4.00 7 03/19~03 81 4.00 7 03/19~03 82 4.00 14 03/26/03 83 4.00 14 03/26/03 84 4,00 28 04/09/03 85 4.00 28 04/09/03 123 500 120 500 133 800 132600 154 500 142 800 28~Da Average 4370 4260 4730 4690 5460 5050 5260 4OOO TECHNICIAN: DISTRIBUTION: EWM (9:30am-11:30am) (1) Pavement Services Corp. (1) City of Coppell 2870 Walnut Hill Lane Dallas, Texas 75229 (214) 351-6419 Fax (214) 351-5148